I <br /> ICITY OF EVERETT,WASHINGTON <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this 9/-1` day of Pal L , 201x5, by and between <br /> the City of Everett, Washington, a municipal corporation existing under the laws of .the State of <br /> I <br /> Washington, hereinafter called <br /> TUthe "City," and <br /> OW CO►aS iRWC!to ) S1.1C. , a <br /> t,v0SIM►-%(,roti., cat Po2A itoN , hereinafter called the "Contractor." <br /> I In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to <br /> furnish all labor, tools, materials, equipment, and supplies required to build and construct and to build <br /> and construct in a workmanlike manner the work, improvements, and appurtenances in accordance with <br /> I the Specifications and Plans entitled: "North Wetmore Stormwater Separation Project" (the <br /> "Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> Ireference and are hereby made a part of this Contract: <br /> A. Notice to Contractors <br /> IB. Instructions to Bidders (if any) <br /> I C. Washington State Department of Transportation Standard Specifications 2014 as <br /> modified by all amendments thereto as of the date of bid opening of this Project <br /> ("Standard Specifications"). <br /> ID. Special Provisions <br /> E. Plans, Drawings and Project Specifications <br /> IF. Addenda(if any) <br /> I G. Payment Bond and Performance Bond <br /> H. Contractor's ProposalBid (conformed copy dated 3- B- a0a ) <br /> II. All provisions required by law whether set forth and reproduced herein or not <br /> 2. Time for Completion. Substantial completion shall be achieved within one hundred ninety five <br /> I (195) working days of the effective date of the Notice to Proceed. Physical completion shall be within <br /> twenty (20)working days of the actual date of issuance of substantial completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional <br /> I <br /> expense in the event that the Contractor does not complete the work in all respects and have it ready for <br /> use by the substantial completion date stated. Because it is difficult to accurately compute the amount of <br /> such costs and damages, the Contractor hereby covenants and agrees to pay to the City liquidated <br /> I damages as computed in Section 1-08.9 of the Standard Specifications, for each and every working day <br /> required to accomplish substantial completion of the work in excess of the period established above for <br /> substantial completion. For overruns in contract time occurring after the physical completion date, <br /> I liquidated damages shall be assessed at the rate of ten percent (10%) of the amount computed in Section <br /> 1-08.9 of the Standard Specifications until the work is physically complete. <br /> 4. Contract Amount. The amount of this Contract is 3 3q5,`7$1. 65 <br /> ($ ) and is based on the proposal'/bid submitted by Contractor dated <br /> North Wetmore Stormwater Separation February,2018 <br /> I Work Order-UP3659 Division C -CONTRACT <br /> SP -35 <br />