My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction 5/2/2018
>
Contracts
>
Capital Contract
>
Thomco Construction 5/2/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:42 AM
Creation date
5/3/2018 10:40:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction
Approval Date
5/2/2018
Council Approval Date
4/4/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
North Wetmore Stormwater Separation
Public Works WO Number
UP3659
Tracking Number
0001182
Total Compensation
$3,395,788.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Notice: A signed, written communication by the Contractor to the City as described in ' <br /> 1-04.5 NOTICE BY CONTRACTOR of these Special Provisions. <br /> Notice of Award: The written notice from the City of Everett to the successful Bidder <br /> signifying the City's acceptance of the Bid. <br /> Notice to Proceed: The written Notice from the City or City's Representative to the <br /> Contractor authorizing and directing the Contractor to proceed with the Work and 1 <br /> establishing the date on which the Contract Time begins. Multiple and partial Notices <br /> to Proceed may be issued on a single Project. <br /> Over absorbed Overhead: Over recovery of fixed indirect costs that occurs when a <br /> Contractor performs more overall Work than it otherwise would have performed. <br /> Overhead <br /> In general, Overhead for the purpose of calculating additional compensation under this I <br /> section of the Contract shall include only those costs that are expended for the <br /> administration of the business as a whole. Such costs usually accrue or are incurred <br /> due to the passage of time, or cannot be traced to a particular project or contract, or <br /> both. <br /> Examples of possible Overhead costs include, but are not limited to, General and <br /> Administrative salaries and benefits, rent, general company insurance, exclusive of <br /> insurance on owned equipment that is directly job costed, depreciation on office <br /> facilities, utilities, maintenance, office supplies, general company accounting and legal <br /> fees, exclusive of amounts expended directly on any specific project, personal property <br /> taxes, general company business licenses, dues and subscriptions. <br /> The following costs and expenses are excluded from the definition and calculation of <br /> Overhead. Overhead costs that vary substantially with the volume of Work performed, <br /> 111 <br /> as measured by billings, shall not be included in Overhead for the purpose of <br /> determining additional compensation for Extended or Unabsorbed Home Office <br /> Overhead, or both. <br /> Examples of costs that are not included in Overhead include: travel and business <br /> meetings, telephones, professional fees expended for the benefit of a specific project, <br /> union welfare benefits, payroll taxes and equipment rental. <br /> If related party transactions are included in a Contractor's Overhead, they must be <br /> explicitly identified as related party transactions and must not exceed amounts that <br /> would be incurred in an arms-length transaction for the provision of the same or similar <br /> goods and services. If such transactions exist and the amounts paid by the Contractor <br /> and included in Overhead are in excess of that which would normally be expended in <br /> an arms-length transaction, an adjustment, in the form of a reduction in the amount for <br /> calculation purposes, must be included in any calculation in determining the amount of <br /> Allocable Overhead. <br /> Overhead shall not include any cost directly attributable to a particular project. If a cost <br /> can be traced to a particular contract, the Contractor may not classify the cost as <br /> Overhead. <br /> Indirect or home office costs that vary substantially with the amount of Work performed <br /> shall not be included in the group of costs comprising Overhead. <br /> Overhead shall not include any costs specifically disallowed by Federal Acquisition <br /> Regulations, Subpart 31.2 — Contracts with Commercial Organizations, or its <br /> successor. Further, "Overhead" shall not include the costs of any "field support <br /> services" that are more closely direct costs in nature, regardless of the manner in <br /> which the Contractor normally accounts for such costs. An example of such disallowed <br /> North Wetmore Stormwater Separation February, 2018 111 <br /> WO No—UP3659 Division 1 —GENERAL REQUIREMENTS <br /> SP-46 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.