My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction 5/2/2018
>
Contracts
>
Capital Contract
>
Thomco Construction 5/2/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:42 AM
Creation date
5/3/2018 10:40:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction
Approval Date
5/2/2018
Council Approval Date
4/4/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
North Wetmore Stormwater Separation
Public Works WO Number
UP3659
Tracking Number
0001182
Total Compensation
$3,395,788.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 2. Moisture conditions and indicated water tables will not vary from those 1 <br /> found at the time the borings were made, and <br /> 3. The ground at the location of the borings has not been physically <br /> disturbed or altered after the boring was made. <br /> Supplement 1-02.4(2) by adding the following: <br /> The boring log data and soil sample data, if any, can be found in Appendix A. I <br /> Bidder may contact City of Everett Project Manager to arrange to view the <br /> geotechnical report. I <br /> 1-02.5 Proposal Form <br /> Delete this section and substitute the following: 1 <br /> The Proposal Form identifies the project and its location and describes the work. It also <br /> lists estimated quantities, units of measurement, the items of work, and the materials <br /> to be furnished at the unit bid prices. The Bidder shall complete spaces on the <br /> proposal form that call for, and are not limited to, unit prices; extensions; summations; <br /> the total bid amount; signatures; date; and, where applicable, retail sales taxes and <br /> acknowledgment of addenda; the bidder's name, address, telephone number, and <br /> signature; the bidder's UDBE/DBE/M/WBE commitment, if applicable; a State of <br /> Washington Contractor's Registration Number; and a Business License Number, if <br /> applicable. Bids shall be completed by typing or shall be printed in ink by hand, <br /> preferably in black ink. The required certifications are included as part of the Proposal <br /> Form. <br /> Bidder shall submit Bidder's Proposal on the Proposal Form provided in the Contract <br /> Documents. <br /> 1-02.6 Preparation of Proposal <br /> Delete "unless it approves in writing" from the second sentence of the first paragraph of 1- <br /> 02.6. <br /> Revise the fourth paragraph of 1-02.6, beginning with "The Bidder shall submit with the Bid <br /> a completed", to read as follows: I <br /> Contractor agrees that the Contractor shall actively solicit the employment of minority <br /> group members. Contractor further agrees that the Contractor shall actively solicit <br /> Bids for the subcontracting of goods or services from qualified minority businesses. <br /> Contractor shall furnish evidence of the Contractor's compliance with these <br /> requirements of minority employment and solicitation. Contractor further agrees to <br /> consider the grant of subcontracts to said minority bidders on the basis of substantially <br /> equal proposals in the light most favorable to said minority businesses. The <br /> Contractor shall be required to submit evidence of compliance with this section as part <br /> of the Bid. As used in this section, the term "minority business" means a business at <br /> least 51 percent of which is owned by minority group members. Minority group <br /> members include, but are not limited to, blacks, women, native Americans, Asians, <br /> Eskimos,Aleuts, and Hispanics. <br /> Delete the seventh paragraph of 1-02.6 and substitute the following: <br /> If the Proposal is made by an individual, his or her name, signature, and post office <br /> address must be shown; if made by a firm or partnership, the name and post office <br /> address of the firm or partnership, a list of the partners, and the signature of at least <br /> one of the general partners must be shown; if made by a corporation, the Proposal <br /> shall show the name of the state under the laws of which the corporation is chartered, <br /> North Wetmore Stormwater Separation February, 2018 <br /> WO No—UP3659 Division 1 —GENERAL REQUIREMENTS <br /> SP—50 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.