Laserfiche WebLink
0 g 10 11 11 ' <br /> �EGEI� D . <br /> BURIED GROUND CONDUCTOR. <br /> -G G- SOFTDRAWN STRANDED COPPER <br /> MATCH LIN (DWG 40-23- 1 E9j) CABLE, #4/0 AWG, UNLESS <br /> � � � 7 3 7 � � NOTED OTHERWISE <br /> SG �j � SG I -� GROUNDWLOOP�TO COLUMNR�SING <br /> � g � BOLTED CONNECTIONS, UNLESS <br /> eoE53 � <br /> �, -�P � NOTED OTHERWISE . <br /> #4/0 AWG GROUND TAP FROM <br /> -G GROUND LOOP TO EQUIPMENT <br /> � � USING BOLTED CONNECTIONS, <br /> � � � � � � � � � � � � � � � � � � � � � � � UNLESS NOTED OTHERWISE <br /> #4�0 AWG EQUIPMENT GROUNQ . <br /> � 10 -0" COIL ABOVE FINISHED FLOOR <br /> � FOR FUTURE CONNECTIONS <br /> 30'-0" x 3/4" ROUND COPPERWELD <br /> � GROUND ROD. TOP OF ROD TO BE <br /> O DRIVEN 2'-6" BELOW FIN. GRADE : <br /> -� GROUND TEST WELL <br /> SG STATIC GROUND POINT <br /> I '" I " <br /> 1 . ALL GROUND CABLE SHALL BE #4/0 SOFT <br /> I �X � i C�ONDUCBOREF RRTHEEMAI�P ROUND LOOP <br /> AND EQUIPMENT GROUNDS, UNLESS <br /> NOTED OTHERWISE. <br /> " 2. INSTALL GROUND CABLE AT THE BOTTOM � <br /> OF TH� GRADE BEAM OR A <br /> MINIMUM OF 2'-6" BELOW GRADE. <br /> �" 3. EXCEPT AT TEST WELLS, UNDERGROUND <br /> CONNECTIONS AT TAPS ANQ GROUND RODS <br /> SHALL USE CADWELD PROCESS. � <br /> I x I 4. GROUND RODS (3/4" x 10'-0" COPPER <br /> CLAD STEEL) SHALL BE INSTALLED A MINI- <br /> MUM 2'-6" BELOW GRADE. INSTALL <br /> � I " � OUTSIDE GROUND RODS AT EACH BUILDING <br /> PERIMETER COLUMN 5'-0" FROM BUILDING <br /> _ � � PERIMETER MAXIMUM SPACING BETWEEN . <br /> r X R0, S TO BE 150'-0". <br /> z 5. AL GROUND CABLE SHALL BE INSTALLED <br /> � G --- G G G —F-} G G G G G G G G $ G G G G G G G G G G G G G G GC•}---- G G G —$-- G � G WITH SUFFICIENT SLACK TO AVOID BREAKAGE. <br /> � �" 6. GROUND CONDUCTORS LEAVING GRADE SHALL <br /> O E T T 0 - G E <br /> c� , <br /> � 'X REFERE�JCE DRAWI �IGS <br /> o — <br /> N I �—� � 1 40-023-E583 STATIC GROUND DETAILS <br /> W � � <br /> ' I x � CONSTRUCTI0 �1 f� OTES <br /> c9 1�- PROVIDE AND INSTALL. 3/4" X 10' GROUND <br /> � X <br /> ROD. <br /> c� <br /> �X <br /> 2. PROVIDE AND INSTALL 4/0 BARE COPPER <br /> GROUND. , <br /> �x <br /> � 3 .- PROVIDE 10' PIG TAIL FOR CONNECTION TO <br /> LRIP MACHINE STEEL STRUCTURE, <br /> I . � COORDINATE FINAL LOCATION WITH EI PRIOR <br /> X TO ROUGH IN. <br /> I � 4. REPAIR ANY REMOVED GROUNDING CUT OR <br /> ,x x x x x x x x x PULLED UP DURING SLAB ENHANCEMENT <br /> FOR LRIP MACHINES <br /> X <br /> 'x 5�j' PROVIDE AND INSTALL STATIC GROUND TEST � <br /> POINT +48" AFF ON TOOL AND BOND TO <br /> " ' GROUNDING PIGTAIL. COORDINATE FINAL <br /> " � � LOCATION WITH EI PRIOR TO ROUGH IN. <br /> 1 3 5 7 9 11 <br /> � .9 2 4 6 8 10 11 ' ,x " I <br /> F' <br /> � 1E9a � 1E9b �_1E9c � 1E9d L lE9e � X I <br /> � � � � � 'X <br /> 1 E9f � 1 E9g i 1 E9h i 1 E9i i 1 E9j <br /> ------F--------{--------I-------- x <br /> x <br /> 1 E9k I 1 E91 I 1 E9m I 1 E9n 1 E9 <br /> %/j//j/// �.�s E' �L <br /> -----i-------I------I--------���/G�% x 4� oF was � <br /> � C���,�' �!'�c�ct� <br /> 1 E9p � 1 E9q ' 1 E9r ' 1 E9s ' 1 E9t H x <br /> —� ti�" o <br /> KEY PLAN BLDG. 40-23 N <br /> SCALE: NONE x ,, <br /> I , , , , , ,x o � b '�� +P 252�6 ,c�' .. <br /> 8 4 0 4 8 16 ��ss oNA��'�����"�� <br /> � X 1 <br /> SCALE: 1/8"=1 '-0" " � <br /> � oo❑ o00 0o A� x � <br /> x � <br /> X X X ;� , <br /> x www.brph.com Copyrighto2015 <br /> G G G G G G G G ' G G G G G G G G G G G G G G G G G G G G G ACCI11teCtS, Engineers, C�nstructors <br /> - n n c,— I � 19020 33rd Ave W,Suite 530 Lynnwood Office <br /> Lynnwood,Washington,98036 <br /> MATC LINE (DWG 40-23-1 E9t) c� � Main#425-255-1095 <br /> / CASNE ENGIN�ERING INC. <br /> ELECTRICAL AND TECHNOLOGY CONSULTANTS <br /> 10604 NE 3$th PL., SUITE 205 KtRKLANO, WA 98033 <br /> (425) 522-1000 WWW.CASNE.COM JOB N0. 151-090 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> ACCEPTABILITY H. GIL 12.16.15 16123 � 12.16.15 <br /> 0 ISSUE FOR CONSTRUCTION (WING LRIP ONLOAD) 16123 CASNE EEK 12.16.15 THIS DESIGN AND/OR C CKED C�RO U N D I N G <br /> SPECIFICATION IS APPROVED E. KRISPIN 12.16.15 SHEET <br /> � T1TLE FACTORY TRANSFORMATION 40-23 WING LRIP <br /> APPROV�D BY DEP7. DATE �. CLUTE 12.16.15 � �� <br /> CHECKED <br /> APPROVED �U I L D I N G 40-23 JOB N0. COMP N0. <br /> WO 15/2899-200 <br /> APPROVED DWG N0. <br /> u ELECTRICAL MASTER G.5-H/9-11 EVERETT, WA 40-23-1E90 <br />