Laserfiche WebLink
EQUIPME�IT PLUMBI �IG GENERA� �IOTES � <br /> N0. QTY DESCRIPTION MANUFACTURER MODEL N0. WATER WASTE GAS PLUMBING REMARKS G E�I E RAL R E MAR K S 1 . SEE SHEETS 1 FS14R THROUGH 1 FS18R FOR <br /> / ADDITIONAL EQUIPMENT REMOVAL INFORMATION. <br /> C.W. H.W. DIRECT INDIRECT SIZE MBTU/H <br /> 1 / SPARE NUMBER 2. SEE SHEETS 1 FS13 THROUGN 1 FS18 FOR NEW AND <br /> 2 / SPARE NUMBER RELOCATED EQUIPMENT INFORMATION. <br /> 3 1 HOSE BIBB BY GENERAL CONTRACTOR 1/2" 1/2" I V OT E S <br /> 4 1 AIR SCREEN MARS 72GH <br /> 5 2 PLATFORM METRO HP53C 1�j EQUIPMENT REMOVED , <br /> 6 1 CALE HOBART HOB 15 2 EQUIPMENT REPIACED ONE FOR ONE WITH MAKE <br /> 7 1 TIME CLOCK AMANO AND MODEL SHOWN. <br /> 8 2 PLATFORM METRO HP55C 3i NEW EQUIPMENT. <br /> 9 27 STORAGE SHELVING METRO SUPER ERECTA-WIRE <br /> 10 LOT HIGH-DENSITY SNELVING METRO TOP RACK Nl E C H A N I CA� �J OT E S <br /> 11 �OT FOOD TRANSPORT CART BY OWNER <br /> 12 / SPARE NUMBER 1 . GREASE TRAPS ARE NOT A PART OF FOOD SERVICE EQUIPMENT. PLUMBING <br /> 3 � CONTRACTOR SNALL VERIFY SIZE AND LOCATION. , <br /> 14 1 STORAGE COOLER KOLPAK 2. CONNECTION FROM ROUGH-IN TO FINAL WATER, STEAM, GAS AND DRAIN <br /> CONNECTIONS ON FOOD SERVICE EQUIPMENT BY PLUMBING CONTRACTOR. <br /> / 1 <br /> � 3. PLUMBING CONTRACTOR TO FURNISH AND INSTAL� 120V UL APPROVED SOLENOID <br /> � „ 2 GAS VALVES OF APPROPRIATE SIZES FOR FUEL SHUT-OFF TO THOSE ITEMS <br /> PROTECTED BY FIRE PROTECTION SYSTEMS. POWER CONNECTIONS BY ELECTRICIAN. <br /> 16 1 HAND SINK DESIGNERS CHOICE HW-P17 1/2" 1/2" 1 1/2" <br /> 4. HOSE BIBBS, WHERE NC?TED, ARE NOT A PART OF THE FOOD SERVICE EQUIPMENT <br /> AND SHALL BE FISHER MODEL 8256 WITH HOT AND COLD WATER CONNECTION TO BE <br /> 18 1 MOP RACK WALTON-MARCH WM-936 FURNISHED AND INSTALLED BY THE PLUMBING CONTRACTOR. � <br /> C <br /> 5. ALL FLOOR SINKS INQICATED SHALL BE F�USH WITH FINISHED FLOOR. <br /> 20 1 STORAGE COOLER KOLPAK <br /> I 6 " � 6. PLUMBER SHALL FURNISH AND INSTALL CHECK VALVES ON HOT AND COLD WATER <br /> 21 41 WALK-IN SHELVING METRO MAX LINES WHERE AN OPEN CIRCUIT IS POSSIBLE BETWEEN HOT AND COLD WATER <br /> SYSTEMS, SUCH AS, BUT NOT LIMITED TO PRERINSE SPRAYS, HOSE REE�S, POT <br /> / RE M FILLERS, KETTLE FILLERS AND HOSE BIBB FAUCETS. <br /> 23 / SPARE NUMBER <br /> 24 f SPARE NUMBER 7. ALL HOT WATER SUPPLY TO BE 140 DEGREES F (60 DEGREES C) UNLESS NOTED <br /> OTHERWISE. 120 DEGREES F AT HAND SINKS. <br /> 25 1 VEGETABLE PREP SINK CUSTOM (2) 1/2" (2) 1/2" (3) 2" � <br /> 26 1 DISPOSER HOBART FD2-200 1/2" 2" 8. THIS ROUGH-IN IS FOR EQUIPMENT FURNISHED BY KITCHEN EQUIPMENT <br /> CONTRACTOR ONLY. REFER TO ARCHITECT'S ELECTRICAL AND MECHANICAL DRAWINGS <br /> 27 1 PRE-RINSE T&S B-136 1/2" 1/2" FOR EQUIPMENT OTHER THAN THAT SHOWN ON THESE DRAWINGS. <br /> 28 1 MIXER (30 QT) HQBART D-300 <br /> 29 1 TABLE DESIGNERS CHOICE WTSU-BS-5-12030 1/2" 1/2" 2" 9. AL� DIMENSIONS SHOWN ARE FROM CENTER LINES OF GOLUMNS OR FINISHED WALL <br /> SURFACES. <br /> 30 1 TABLE DESIGNERS CHOICE WTSU-BS-5-12030 <br /> 31 / SPARE NUMBER 10. ALL LINES TO COME OUT OF WAL�S OR FLOORS AT HEIGHTS INDICATED BY "+" <br /> 32 / SPARE NUMBER INCHES. IT SHALL BE TNE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO <br /> INSURE THAT ALL UTILITIES AND CONNECTIONS SHALL CONFORM TO LOCAL AND . <br /> 33 APPLICABLE CODES. <br /> 34 11 . ALL UTILITIES LINES SHALL BE CONCEALED IN WALLS AND COLUMNS UNLESS <br /> 35 NOTED OTHERWISE. <br /> 36 <br /> 12. PLUMBER SHAL� INTERCONNECT ALL COMPONENT PARTS OR SECTIONS OF <br /> 37 EQUIPMENT NOT PRE-PLUMBED BT THE MANUFACTURER ANQ ALL EQUIPMENT <br /> 3g DELIVERED IN SECTIONS TO ACCOMMODATE ACCESS. <br /> 39 13. FOR ADDITIONAL INFORMATION REGARDING FOOD SERVICE EQUIPMENT AND/OR TYPE <br /> 40 OR METHOD OF UTILITY CONNECTION, REFER TO THE MANUFACTURER'S SPECIFICATION � <br /> 41 1 COFFEE URN AMERICAN METAL WARE 81010 1/2" SHEET IN TNE FOOD SERVICE EQUIPMENT BROCHURE PROVIDED BY THE KITCHEN <br /> 42 1 DISH-UP TABLE DESIGNERS CHOICE WTSC EQUIPMENT CONTRACTOR. <br /> 43 � STAINLESS STEEL COUNTER CUSTOM 14. PLUMBING CONTRACTOR SHALL INTERCONNECT HOT WATER LINE FROM VENTILATOR <br /> 44 � STAINLESS STEEL COUNTER CUSTOM CONTROL CABINET TO VENTILATOR AND INTERCONNECT BETWEEN VENTILATOR SECTIONS. <br /> 45 15. PLUMBING CONTRACTOR SHALL INTERCONNECT FROM DETERGENT PUMP IN <br /> 46 1 HOSE RACK ASSEMBLY CUSTOM 1/2" 1/2" CONTROL CABINET TO DETERGENT INLET ON HOT WATER LINE. <br /> 47 16. FIRE SPRINKLER CONTRACTOR SHALL INTERCONNECT FROM FIRE PROTECTION <br /> 48 SYSTEM CONTROL CABINET TO IN�EI- CONNECTION ON VENTILATOR. INTERCONNECT � <br /> 49 1 DISHWASHER CHAMPION MODEL 64 RACK CONVEYOR 3/4" 1 1/2" �, BETWEEN VENTILATOR SECTIONS. <br /> 5Q 2 EXHAUST VENT CUSTOM <br /> 51 CO �ISTRUCTOf� NOTES <br /> 52 <br /> 53 LOT SHELVING SERVOLIFT EASTERN C40-S � REMOVE EXISTING WALK-IN FAN COOLER. <br /> 54 <br /> 2�`j REMOVE EXISTING 4-ZONE REFRIGERATION SYSTEM <br /> 55 2 TRENCN DRAIN SANI-FLOOR / SF-2-22 �'� � AND ALL APPURTENANCES AFTER INSTALLATION OF . <br /> 56 / SPARE NUMBER NEW REFRIGERATION EQUIPMENT. <br /> 57 3 MOBILE POT RACK METRO HD SUPER <br /> 58 1 POT SINK CUSTOM (2) 3/4" (2) 3/4" (3) 2" <br /> 59 1 POT RACK DESIGNERS CHOICE WPRS-2-84 <br /> �� �� <br /> 60 <br /> 61 / SPARE NUMBER <br /> G R O U P <br /> , <br /> � 600 Stewart St., Ste 1400 � <br /> 63 10 WALK-IN SHELVING METRO MAX Seattle, Washington 98101 <br /> ' " � � ISSUE FOR PERMIT -re� 206.267.1700 <br /> „ , , <br /> 11 .01 . 17 Fax 206.267.1701 <br /> SAZAN # 543-1759 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE � DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> �,�, ��,� ACCEPTABILITY A. GEHRKE 12.31.06 CAFETERIA EQUIPMENT & UTILITIES SCHEDULE 21241763 C � � .o� .� � <br /> A RE—SCALE DRAWING CONVERSION 556108-00 AG/BERONA 12.31.06 � oc �4-,.sfj,��; THIS DESIGN AND/OR CHECKED <br /> �h�' �� c� SPECIFICATION IS APPROVED R. NUDO 12.31.06 SHEET <br /> B 40-092 PRODUCTION KITCHEN RENOVATION 586209-00 DLR GROUP LS/MV 09.22.08 � ��� ,P� ;� g , �, EN INEER TiT�E <br /> r��� �� APPROVED BY DEPT. DATE 40-92 WALK-IN MACHINERY REPLACEMENT & G�YCOL LOOP DEMO <br /> BOEi�v� � " FS 1 . 1 R � <br /> �� _°� ���� , �'�=���"�� CHECKED <br /> — RECORD DRAWING 586209-00 DLR GROUP LSEELEY 07.08.09 � 31�'' � B U I LD I N G `�'O'O7Z <br /> ��'�'1����'1��1'��'���'�'� � APPROVED JOB N0. COMP N0. �_ <br /> C 44-92 WALK—IN MACHINERY REPLACEMENT & GLYCOL LOOP DEMO 21241763 SAZAN 11.01.17 ��h��1, �T 586209-00 <br /> 11I01/2017 APPROVED DWG N0. <br /> MECHANICAL MASTER EVERETT, WA 40-Q92-FS1 .1 R_MECHANICAL <br />