|
� � �� - � � � - � - - � � - - � � - � � � - � � - � - � - � � - - � � � � � � �� � � �
<br /> 3 j8" JOINT WIDENING SAWCUT
<br /> 0.1 T
<br /> 2
<br /> 53 2 2 - 1/4" GROUND BEVEL, TYP.
<br /> 53 53 �
<br /> `, ;, r
<br /> � JOINT SEALANT
<br /> J T
<br /> � � � o � D `� � � � �� �� � � D `� �� �� � � 0�2T � � �, �
<br /> � � � � � > � �
<br /> �__, G
<br /> � ------- � -- - - - -
<br /> � � G
<br /> WATER BLAST, AND PRIME
<br /> � — _� � � � �-� � � � o� � � �� �� _ ��� w � � ° � � EACH FACE OF JOINT 3 4„
<br /> z r� PRIOR TO PLACING �1/4" GROUND BEVEL, TYP.
<br /> Y � SEALANT
<br /> U
<br /> _ � � JOINT SEALANT
<br /> O. DOWEL 5 ~ —
<br /> TYPE SEE DETAIL Z
<br /> 53 SLOPE 1 :4 w �- BACKER ROD
<br /> SAWCUT CONTRACTION JOINT w �
<br /> > � _ `'
<br /> �COMPASS ROSE ONLY� TYPEOO . TYPEOO . a �
<br /> DOWELED CONTRACTION JOINT KEYED CONSTRUCTION JOINT � WATER BLAST, AND PRIME r�-�
<br /> �- EACH FACE OF JOINT
<br /> (COMPASS ROSE ONLY) o PRIOR TO PLACING BACKER ROD
<br /> F- SEALANT 3/4" WIDE EXPANSION
<br /> Q JOINT MATERIAL CAST IN
<br /> � PLACE FULL DEPTH OF
<br /> � PAVT. 1YP
<br /> = INITIAL SAW CUT
<br /> EXISTING OR NEW PCC W (NOT REQUIRED FOR
<br /> PREVIOUSLY PLACED S3 PAVEMENT o CONSTRUCTION JOINTS}
<br /> PCC PAVEMENT �
<br /> �
<br /> U
<br /> � - ���� 1 2 DO EL � ��
<br /> f- LENGT
<br /> i- - - -
<br /> DOWELS SHALL BE DRtLLED AND SECURED
<br /> WITH FAST-SEI-fING EPDXY GROUT INTO DOWEL
<br /> CURED CONCRETE. EPDXY GROUT SHALL SEE DETAIL S
<br /> BE PRESSURE INJECTED TO BACK OF HOLE 53 LO N G ITU D I NA� 0 R TRAN SVE R S E J 0 I NT 2 EX PAN S I 0 N J 0 I NT 3
<br /> AND DOWEL INSERTED. DRI�L HOLES SHALL
<br /> BE 1/8" LARGER THAN DOWEL DIAMETER.
<br /> SAWCUT AND REMOVE EXISTING SCALE: NONE — C530 SCALE: NONE — C530
<br /> MALE KEY WAY IF PRESENT
<br /> (EXISTING PAVEMENTS ONLY)
<br /> TYPEOO .
<br /> DOWELED CONSTRUCTION JOINT �
<br /> w
<br /> NO DOWEL BARS IN "DOG LEG" JOINT, TYP. Y
<br /> c�
<br /> DOWEL BAR, TYP. �
<br /> gCONSTRUCTION JOINT OR
<br /> N CONTRACTION JOINT, SEE
<br /> DETAIL 2 THIS SHEET
<br /> -a-+-' - - ~
<br /> ; �
<br /> � � � L
<br /> - �
<br /> � ' - -�-�� v�
<br /> EXISTING OR VARIES 5' MIN. -��--{�'- � � _ �� �-�� �
<br /> PROPOSED -�-�- -� - �
<br /> a
<br /> CONCRETE 3 PR�POSED CONCRETE 2 i I_ �
<br /> PAVEMENT PAVEMENT ,- � -�- � � � � � �
<br /> 53 � 53
<br /> 53 �-� � ' L�2
<br /> i i � i i � _
<br /> » VARY � i- � � _� + _
<br /> DOG
<br /> LEG JOINTS _ _ - � DOWEL, PAINT AND GREASE
<br /> - �1-- �
<br /> , � _ , , � � � < < �� � � � , � < - � 1 MIN - 5 MAX - - - ONE HALF
<br /> � F � t , �� � � , t , < < ,
<br /> �� < < � � �, �`�� �<� � < < <� � � � , _ �
<br /> , � � ��, � � � < - , ti
<br /> � ; �
<br /> , � � � < < - , � � �� � ,�< - � �� �- � ��` � � � , �
<br /> � �
<br /> ,
<br /> ,�
<br /> < ;
<br /> � � � r , < < << � , , ��
<br /> ` � , � ��
<br /> �
<br /> � - � < , , , , � _ ��� �<, � t ;
<br /> �
<br /> s , < < �< ,
<br /> _ < `
<br /> � < � , < <<< _
<br /> , � � ,
<br /> � ,
<br /> �� : �� � t� � t��� _ , < � � �<� ��� �,
<br /> c
<br /> < < < �, , < < ;
<br /> i � � _ <- � � << � < � � � � _ �
<br /> _ °° - --- �-t- #4 C�D 12
<br /> , , � � �� << �,< <<< � �, <, <�� < _� -
<br /> � , , � . , � , � � � � �- < � - � < � �
<br /> � _ < < , �<� �� -`�� < z � << _ � _ WAY
<br /> � ' ., .�� � � `.� �_ . i � ; � - � �� . � t � < .i<�.� < �� : `� L� `i , i p _7.__�_
<br /> � ,; � � � , , < � � , � < < _ �,� � � EACH SOLID STEEL DOWEL
<br /> �- � , � , E ��` � � _ � ��� -
<br /> � , �4, � � � ' < < � , � ��, ` � - < }- +--. - -
<br /> � � � � � � � ` ' � � ' ` �� � ���' PAVEMENT DOWEL DOWEL DOWEL
<br /> � < <� ;�� � � < < � � , - � �, ' �- ;n
<br /> ` � � � ; -+ c.i THICKNESS DIAMETER SPACING LENGTH
<br /> �
<br /> , i �- - �$„ 3�4�, �2» 16»
<br /> � ��-
<br /> 1 .5' � �-�;-- -
<br /> i _�
<br /> � � ' ' ` 8» 1 » 12» 20„
<br /> � �
<br /> * TYPE B FLIGHTLINE STALLS, t- i ' -
<br /> � TYPE A AND E COMPASS ROSE � I �I ������;�
<br /> IYPE � �» � ��4�, �2�, 2d�,
<br /> EXPANSION JOINT
<br /> VARIES 12.5' 13" 1 1/4" 12" 20"
<br /> 15" 1 1/4" 12" 20"
<br /> J�INT TYPE DETAILS 1 ODD - SIZED PANEL REINF� RCEMENT 4 DOWELS 5
<br /> SCALE: NONE C530 SCALE: NONE — C530 SCALE: NONE — C530
<br /> � — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — �
<br /> � OR RE � ER EN CE ON � Y
<br /> DETAILS APPLICABLE
<br /> TO THIS PROJECT FACILITY DESIGN BY cE� DATE o3.07.��
<br /> THIS DESIGN AND OR A SUBTITLE CONCRETE PAVING DETAILS CURRENT REVISION SYMBOL DATE
<br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE _
<br /> A CEPTA ILI HNTB H EMMEff 16 JUN 09
<br /> - RECORD DRAWING HNTB/HAE HNTB/RHM 06.16.09 SPECIFICATION IS APPROVED HNTB A NAPIER SHEEf
<br /> � TITLE 2008 FLIGHTLINE EXPANSION C530
<br /> BOE,�� APPROVED BY DEPT. DATE HNTB R MILLAR
<br /> CHECK D
<br /> HNTB W DeBOER 45'YD
<br /> APPRO ED JOB N0. COMP N0.
<br /> HNTB J GRANT
<br /> APPROVED CIVIL MASTER COL. X—X/X—X EVEREI�T, Wq °wc No. 45—YD—0530
<br />
|