My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/04/11 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/04/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 10:16:58 AM
Creation date
5/10/2018 10:16:36 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 8 <br /> PROJECT TITLE: <br /> Award Contract for the Briefing COUNCIL BILL# <br /> construction of Water Main Proposed Action Originating Department Public <br /> Replacement"Q"—Evergreen Works/Utilities <br /> Way Rebid Project to SRV Consent Contact Person Richard Hefti <br /> Construction Company Action Phone Number 425-257-7215 <br /> First Reading FOR AGENDA OF April 11, 2018 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Evergreen Way—E. Call for Bids—Feb 14, Bid Summary Public Works <br /> Casino Rd to Holly Dr 2018 <br /> Amount Budgeted $1,300,000.00 Fund 336 <br /> Expenditure Required $1,450,524.96 Account Number(s): UP 3612 <br /> Budget Remaining $0.00 <br /> Additional Required $152,524.96 <br /> DETAILED SUMMARY STATEMENT: <br /> Bids were opened on March 20,2018 with 3 bids received for the Water Main Replacement"Q" <br /> Evergreen Way Project. <br /> SRV Construction Company submitted the lowest responsive and responsible bid in the amount of <br /> $1,450,524.96. This is 24.6%over the Engineer's Opinion of Probable Construction Cost of$1,163,970. <br /> Higher costs are attributed to using earthquake resistant ductile iron pipe, and the requirement for night <br /> construction due to traffic lane closure requirements. <br /> Expenditures project to date: <br /> Budget Amount $1,300,000.00 <br /> Construction Bid $1,450,524.96 <br /> Advertising Cost $2,000.00 <br /> Additional Required $152,524.96 <br /> The original bid was received on June 27,2017 in the amount of$1,759,618.72. Council rejected all bids <br /> on July 29,2017 and authorized re-bid of the project. <br /> There are no supplemental bidder requirements associated with this project. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Award Contract for the construction of the Water Main Replacement"Q"—Evergreen Way Rebid Project to <br /> SRV Construction Company in the amount of$1,45015124.96,including Washington State Sales Tax. <br />
The URL can be used to link to this page
Your browser does not support the video tag.