Laserfiche WebLink
CERTIFICATE OF COMPLETION <br /> Project: Water Filtration Plant Operations Bldg. Seismic Retrofit - Rebid <br /> Contractor: Kassel &Associates, Inc. <br /> Work Order No. UP3600 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> 14),4,X 4 i lICIAr <br /> Public Works Dir for Date <br /> Paul Kaftanski <br /> Approved by: <br /> (---------- <br /> 5 <br /> Mayor, City of Everett Oat- <br /> Cassie Frankl. <br /> Attes ii <br /> '`,iv ler <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: ,:11i ` <br /> im Iles, City Attorn <br /> Date <br /> vp._(, //S1 <br />