My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hydrology Stand Up Paddle LLC 5/1/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Hydrology Stand Up Paddle LLC 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 11:47:59 AM
Creation date
5/10/2018 11:47:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Hydrology Stand Up Paddle LLC
Approval Date
5/1/2018
End Date
12/31/2018
Department
Parks
Department Project Manager
Cory Rettenmier
Subject / Project Title
Paddle Board Rentals and Classes
Tracking Number
0001215
Total Compensation
$650.00
Contract Type
Agreement
Contract Subtype
Use of Property
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. COMPLIANCE WITH LAW. HYDROLOGY STAND UP PADDLE <br /> agrees to comply with all applicable City, County, State and Federal regulations <br /> and laws and acquire all permits required by law or regulation. <br /> 11. INSURANCE. HYDROLOGY STAND UP PADDLE shall maintain <br /> commercial general liability insurance coverage during the term of this License <br /> with $2,000,000 combined single limits, which insurance shall be primary and <br /> non-contributing. HYDROLOGY STAND UP PADDLE shall ensure the City is <br /> endorsed as an additional insured on the policy. HYDROLOGY STAND UP <br /> PADDLE shall provide the City evidence of coverage and endorsement. Insurance <br /> coverage and limits of liability as specified herein are minimum coverage and limit <br /> liability requirements only. They shall not be construed to limit the liability of <br /> HYDROLOGY STAND UP PADDLE or any insurer for any claim that is required <br /> to be covered hereunder. Moreover, the City shall be an additional insure, where <br /> additional insured status is required, for the full available limits of liability <br /> maintained by HYDROLOGY STAND UP PADDLE, whether those limits are <br /> primary, excess, contingent or otherwise. HYDROLOGY STAND UP PADDLE <br /> shall provide the City proof of their membership in U.S. Rowing. <br /> 12. NON-INTERFERNCE WITH CITY USE. HYDROLOGY STAND UP <br /> PADDLE's use of the Property shall not interfere in any way with any City use of <br /> the property. <br /> 13. RELOCATION. HYDROLOGY STAND UP PADDLE specifically agrees <br /> to relocate or removed, whichever the City requires, all or any part of its materials <br /> located on the Property due to maintenance, repair, or construction of City's <br /> property or a City improvement. HYDROLOGY STAND UP PADDLE shall <br /> commence the relocation or removal within thirty (30) days of notice by the City <br /> that HYDROLOGY STAND UP PADDLE must relocate or removed materials. If <br /> HYDROLOGY STAND UP PADDLE fails to commence the relocation or <br /> removal as required or, having commenced it, fails to proceed with reasonable <br /> dispatch, the City shall, in addition to its remedy for damages, be entitled to <br /> specific enforcement of HYDROLOGY STAND UP PADDLE's obligation <br /> hereunder and shall also have the right and authority to remove, at HYDROLOGY <br /> STAND UP PADDLE's expense, such portion of the materials as HYDROLOGY <br /> STAND UP PADDLE has failed to relocate or removed without incurring any <br /> liability whatsoever. <br /> 31Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.