My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5317 COLBY AVE 2018-05-14
>
Address Records
>
COLBY AVE
>
5317
>
5317 COLBY AVE 2018-05-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 10:31:11 AM
Creation date
5/14/2018 10:31:10 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
5317
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOR OFFICE USE ONL1� PERMIT# Z' �� <br /> � , BUILDWG � �� � � PLANNING , � ` � �� <br /> Bldg/TI/Addn/Rem Size Zoning Classification <br /> Garage Size Overiay/Agreement <br /> VALUATION Nonresidential Use <br /> Number of Stories Residential Use <br /> Occupancy Group Proposed No. of Dwelling Units: <br /> Occupant Load Total No. of Dwelling Units: <br /> Basement No Yes Fin / Unfin Landscape or Planning Inspection <br /> Type of Construction needed before final? Yes No <br /> Existing Sprinkler System? Yes No Unk Planning Inspector: <br /> Fire Sprinkler Required Yes No Phone#: <br /> Reason Approved by: Date: <br /> Existing Fire Alarm Yes No Unk Historic Approved by: Date: <br /> Fire Alarm Required Yes No School Mitigation Reqd? Yes No <br /> Reason Everett School Dist Mukilteo School Dist <br /> RCW 64.55 MF worksheet req'd for permit? Yes No #of Net New Units: <br /> Add'I RCW 64.55 docs required prior to final?Yes No Calculated School Impact Fee: <br /> �' <br /> Architectural Approved: Date: School Impact Fee Credit: <br /> StCuctural Approved: Date;Z /'7 /7 Total School Impact Fee Owed: <br /> Comments: z�l5 �� C Comments: <br /> Intake OK by: <br /> Intake OK by: Date: <br /> PUBLIC.WORKS <br /> FEES INTAKE: Checked By: Date: <br /> Plan Check Fee Comments: <br /> Building Permit <br /> Surcharge High Hazard Sites(Dental,Medical,Animals,Mortuary,etc-Review for RPBA) <br /> Additional Plan Check ❑ Public Works/Sys Dev/Traffic Mit./RPBA-NOT REQUIRED <br /> Plumbing Fee ❑ Route for Public Works Review(bldg folder, PW Worksheet) <br /> Mechanical Fee ❑ Public Works Permit-Concurrent Review(separate reen folder) <br /> Ping Bldg Review Fee PW REVIEW: PW Reviewer: Date: <br /> Water Fee ❑ PW Permit Approved-PW <br /> Sewer Fee ❑ See PW Review Worksheet <br /> Systems Dev. Fee ❑ PW Permit Not Required <br /> Traffic Mitigation Fee <br /> Public Works Fee 'FIRE DEPARTMENT <br /> School Mitigation Fee Update/New Sprinklers Yes No Existing Bldg._ <br /> Update/New Detection Yes No Existing Bldg._ <br /> Update/New Chemical Yes No Existing Bldg._ <br /> Update/New Fire Service Yes No Existing Bldg._ <br /> Approved by: Date: <br /> Comments: <br /> �� <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.