My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1205 CRAFTSMAN WAY DOCK H 2021-12-06
>
Address Records
>
CRAFTSMAN WAY
>
1205
>
DOCK H
>
1205 CRAFTSMAN WAY DOCK H 2021-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2021 9:09:35 AM
Creation date
5/14/2018 10:42:03 AM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1205
Tenant Name
DOCK H
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
425-259-2794 �1:05:30 p.m. 02-20-2017 3/3 <br /> Central Marina H Dock Emergency Power Repairs R� <br /> MR-CM-2017-04 <br /> � PQRT OF EVERETT <br /> AGREEMENT FOR EMERGENCY PUBLlC WORKS <br /> Centra)Marina H Dock Emergency Power Repairs <br /> PROJECT NO.MR-CM-2417-04 � <br /> The part af Everett,a port district of the State of Washingtan(herelnafter,the"Part")and Seahurst <br /> E[ectric(hereinafter the"Contractar'),€n consideration of the mutual covenants herein,agree to enter <br /> into an Emergency public Works Agreement as foElows: <br /> ARTICLE 1-WORK <br /> 1.1 Declarativn of Emergency:The Port of Everett issued an Emergency Declaration as a result of <br /> the eledricak�re that impacted power ta Centra)Docks H,I and J. The Emergency Declaration <br /> waived competitive solicitation requirerrsents. <br /> 1.2 CONTRACTOR shall compfete a31 Work as specified in the Emergency Public Work Task Order or <br /> indicated in the Contractn�'s Quote.The Work is described as fo[lows: <br /> � Prov�cfe and irtstall 750-feet af 3/C type G cable(with grnund)from Unit Substation H to the <br /> southernmost boathouse tap on H-Dock(thts is a dtrect repiacement o€the previously <br /> instatled powercable). Ca61e shall be tnstalled in existing interna!ducts on main-walk and <br /> H-dock. Con�nect to existing 25b-amp clrcuit breaker in untt substatfon. Provide staintess <br /> steel straJn relief for cable 6etween main-walk and H-Dock <br /> • tnstalf new tap conductors frorn feeder tap tn float junctian boxes to(38)exJsting boathause <br /> meter using 4/C#6 type SOOW cord or equal. Assume 25 linear feet af cocd per boathouse <br /> between tap and meter base. <br /> » Connect(38)sets of tap conductors to feeder using reusabie submersible gel type <br /> spli�es. Quantity as requlred. <br /> • Repair damaged 30"x 17"junctfon box as recommended by float manufacturer(BMI). <br /> � Obtain electrical permit;call for inspections. <br /> • Perform insulation resistance tests after completion. Troubleshoot and repair faiting rabfes. <br /> • Existing Conditions: Port personne!has removed the existing feecler between Unit <br /> substation H and the southern end af H-�ock. lunction boxes have been cleaned. No pult <br /> strings are installed in empty�chases:`The Porf will provide 508-feet of 250lcCM wire 1n the <br /> next phase oF repair work(do not tnclude in quote for th(s phase}. A temporary power <br /> system may 6e installed by a thfrd party uslpg above deck cables and temporary panels; <br /> installation wiil be simitar to t�ade show power system. <br /> ARTICLE 2—REPRESENTATIVE <br /> 2.i The PDRT's representative shall be Greg Dawsey,heretnafter referred#o as PROlECT MANAGER; <br /> 2.2 The Cantractor designatesJeff Hermann,as it's�Representative for the proJect. The Cantractors <br /> Representative is{ts liaison offlcer ta the PORT for afl purposes in carrying aut the Project. <br /> Rev. 10/11/13 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.