My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4920 EVERGREEN WAY BASE FILE 2018-05-17
>
Address Records
>
EVERGREEN WAY
>
4920
>
BASE FILE
>
4920 EVERGREEN WAY BASE FILE 2018-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2018 8:11:46 AM
Creation date
5/15/2018 8:18:43 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
4920
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> � � <br /> j <br /> . ��-..#:, E <br /> � ' �� � <br /> ` <br /> � � <br /> ! <br /> Me111� <br /> TO: Public Works—Permit Department <br /> FR�M: Brian Christiansan, L.E.G. <br /> Terracon <br /> DATE: December 11, 20�7 <br /> RE: Right of Way Application far the Rockery <br /> Failure Project—Staples Property Adjacent City of Everett Glacier Lane ROW <br /> 4900 black Glacier Lane—South of 50�'Streef SE, Everett,WA <br /> Terracon Project No. 81175122 <br /> Proposed �xploration <br /> Terracon is a subconsultant working far Hilbers Incorporated property rnanager for the Stables <br /> Store for an em�rgency rockery failure repair project in the City of Everett. <br /> We are proposing #o driil 1 test boring in the City of Everett Glacier Lane Right-of-Way The <br /> approximate boring location is shown on the attached Google Earth images. <br /> The test baring wiil be appraximately 60-foot deep and approximately 40Q to 5{30 feet south of <br /> 54th Stree#SE. on the east shoulder and roadway of Glacier Lane. <br /> This work is located on a dead end raad with 3 to 4 homes lacated across the street fram the <br /> drilling location. We proposed to use shoulder closure on Glacier Lane. We have included <br /> WSD�T traffic Cantrol Plan attached for this boring. We anticipate if will take less than an half af <br /> tlay to drilL <br /> The truck-mounted auger drilled boring wil! create a barehole of approximate 8-inch diameter to <br /> a depti�of about 60 feet below ground surface. Restoration will take place upon completion of the <br /> boring will consist of backfill with bentonite chips (per Washington State Department of Ecology <br /> well regulatians) to about 3 feet below ground surFace. If the boring is iacated in the roadway it <br /> will then ha�e dry packed rapid set pre-mix Portland cement concrete to bottom of pavement <br /> Terraco,n C�nsuEtants, Inc. 29905 64'�Avenue V�+est Ma�ntlake 7errace, �v`A °8043 <br /> P [425j 771 33Q4 F (425j 771 3549 ierracon.com <br /> , � � � <br /> ' e: <br /> �,`Jr <br />
The URL can be used to link to this page
Your browser does not support the video tag.