Laserfiche WebLink
20"I5 WaShII1gt011 Stat2 Energy Code Compliance Forms for Commercial,R2 and R3 over 3 stories and all R1 <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017 <br /> Project Information Project Title: Tropical Tan Date 4/3/2017 <br /> Applicant Information. Provide contact information forindividual who can respond to For Building Dept.Use <br /> inquiries aBouf compliance form information provided. <br /> Company Name: Evergreen State Heat 8�AIC <br /> Company Address: 2120 Pacific Ave,Everett,WA 98201 <br /> Applicant Name: Mark Payne <br /> Applicant Phone: 425-252-3174 <br /> Project Description ❑ New Building � Building Addition ❑ Tenant Improvement Q System Retrofit ❑ No System Changes <br /> Brieflydescribe mechanical systems in Replacing like for like with same capacity,power requirements and gas heat as old unit..old unit provided <br /> the textbox provided sufficent heating and cooling.Unit is a single phase 5 ton RTU. <br /> � Total Bldg Performance(TBP) <br /> This path includes all mandatory <br /> provisions per C401.2 Option 2. <br /> MECH-SUM,MECH-CHK,and C407 <br /> Energy Analysis forms reguired. <br /> [] Load calculation summary Q MECH-LOAD-CALC Form <br /> Design Load Calculations Provide design load calculations for all mechanical systems and equipment serving the building heating,cooling or <br /> ventilating needs.If a load calculation summary is provided with the permit documents that includes all applicable <br /> compliance information then the MECH-LOAD-CALC form is not required. <br /> Q✓ Mechanical Plans ❑ MECH-EQ Forms(TBD) <br /> Mechanical Schedules Indicate location of equipment compliance information.If provided on plans then MECH-EQ forms are not required, <br /> however,include on plans all applicable compliance informafion listed in MECH-EQ tables. <br /> � DOAS is required per C403.6 effective July 1,2017(offce,retail,education,library and fire station occupancies) <br /> All occupied,conditioned areas shall be served by a DOAS that delivers required ventilation air in a manner that does <br /> not require space conditioning fan operation.Space conditioning fans cycled off when no heating or cooling is reguired. <br /> Dedicated Outdoor Air ❑ Ventilation provided via natural ventilation per2015 IMC in lieu of DOAS(C403.6,Exception 1) <br /> System Requirements and ❑ Zentilation and space conditioning provided by a HEVAV system per C403.7 in lieu of DOAS(C403.6,Exception <br /> ) <br /> High Efficiency VAV ❑ DOAS included in project,although not required(occupancy not office,retail,education,library or fire station) <br /> Alternate � DOAS related allowances included in project: <br /> ❑ Prescriptive vertical fenestration maximum area allowance increased to 40%per C402.4.1.4 with 100°/a of <br /> conditioned floor area in building served by DOAS. <br /> ❑ Exception to air economizer per C403.3 Exception 1,include MECH-ECONO form. <br /> Q Project includes HVAC air distribution systems that provide heating and/or cooling <br /> If yes,provide a MECH-FANSYS-SUM form. <br /> Fan Power � For one or more systems,the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp. <br /> Ifyes,provide a seperate MECH-FANSYS form foreach HVAC system exceeding fhe 5 horsepowerfhreshold. <br /> Refer to Section C403.2.11 and MECH-FANSYS-DOC for requirements and exceptions. <br /> � Hydronic chilled water � Water-loop heat pump � No hydronic systems <br /> HVAC Hydronic Systems <br /> ❑ Hydronic heating water ❑ Geothermal <br /> � C406.2 More efficient HVAC equipment and fan systems <br /> Requires 90%of heating and cooling capacity to Be equipment listed in tab/es C403.2.3(9)-(9)or air-to-waterheat <br /> pumps and heat recovery chillers.All equipment listed in tables C403.2.3(1)-(7)must be 95%more efficient than <br /> minimum requiremenfs.All stand alone supply,retum,and exhaust fans over 1hp musE have FEQ>_71 and must be <br /> C406 Additional Efficiency selected within 90/ofmaximum total orstaticpressure. <br /> ❑ C406.6 Dedicated outdoor air system(DOAS) <br /> Options-Mechanical Requires 90%of conditioned floor area to be served by a DOAS per C403.6 that delivers required ventilation air in a <br /> manner that does not require space conditioning fan operafion. <br /> � C406.7 Reduced energy in service water heating <br /> Requires 90%of floor area be in occupancy types listed in C406.7.1 and that 60%of annual hot wafer energy use be <br /> provided by heat pump,waste heat recovery or solar water-heating systems. <br />