CONSTRUCTION NOTES
<br /> 1.The contractor shall camply with all palicies and procedures contained in ATkl's Metro Field Operatfons CanstrucBon
<br /> Standards Manual and all requirements from local permitting authorities.Laal permRting authorities indude: City of Everett
<br /> The various permits obtatned for the project are on file m the offlces of the engineer.
<br /> 2 Miscellaneous structures and obstructions such as sign posts,matl boxes,meter boxes,or other obstructions,shall be
<br /> awided or removed and reinstalled to original or better condtion.
<br /> 3.The contractor shall be responsible,at all times; for the maintenance of the streets or other utllitles affected by
<br /> canstruction operations—debris shall not be permftted to accumulate and all premises shall be maintained in a neot workmon
<br /> Ike conditian.
<br /> 4.The contractor shall take adequate precautions to pratect exfsting faclities,sidewalks,curbs,pavements,uUfities,fdiage,
<br /> adjolning property and structures autside of right—of—way,and to avoid damage there to.
<br /> 5.The following special provisfons sholl apply to traffic regulation during the extent of this project
<br /> o.There shall be,at all tlmes,adequote vehicle and pedestrian access for ingreu and ecgess for the propertfes adJacent to
<br /> the project
<br /> b.During non—waking hours,the contractor shall keep the existing traffic lanes dear Gom interference induding all
<br /> approaches and intersecttons.
<br /> c.If lane blodcage is unavoidable,the contractor shall notify the traffic engineering departments,police deportments,flre
<br /> departments,ambulance services,schod bus garages and other agency operations as appropriate so these agencies may
<br /> re—route their vehides around the construction zone(s).
<br /> 6.Where hazardous conditions exist; proper signmg,flagging and barricading shall be provided as directed by the engineer.
<br /> Supplemental signs,flag persons and barricades shall be provided by the contractor.
<br /> 7.Trenches in paved areas shall be saw—cut to the full depih if surfaang or as required by the permitting authority.Paved
<br /> surfaces shall be repaired in axadance with the permitting authoritys speaficatiana
<br /> &The contructor shall comply with all arrent and appl"�cable Occupational Safety and Health Administration(OSHA)federal,
<br /> state and local rules aid regulations goveming the safety of wnployees and material during excavation,trenching,ditching,
<br /> and installation and backfilling operations on this project
<br /> 9.As roqufred,a waste site shall be designoted for the disposal of excess mataials and debris.
<br /> 10.No trench or excavatian site shdl be left open overnight or unattended.
<br /> 71.Right—of—way restoration and street and sidewalk repair/replacement shall be in compliance with the local
<br /> permittngautharity.
<br /> 12.All flber cable minimum depth must be 48".
<br /> 13.When it is warranted to use dielectrfc fiber cable is an underground situation with no metalltc canduit,a solid copper
<br /> tracer wire of 12 AYlG gauges must be pulled and placed along wfth the dielectric
<br /> ��
<br /> cable in the sane conduil This copper tracer wire must be grounded at each acce�point(manhde,handhde or ped)and
<br /> shull serve 1he same purpose as the metal contnuity of armored cables to allow for dectronic location during plant
<br /> protection.
<br /> 74.Innerducts ocapied by the cable shall be sealed at termination points usmg rubber plugs and compression band� vacant
<br /> innerducts or canduit runs shall be sealed at termination points wlth a rubber plug equipped with a pull Iine attachment ring
<br /> on whtch to terminate the pull line.Approprfate seal�t compound shall be used to seal any gaps.
<br /> 75.Innerducts must be smooth bore pdyethylene with a mhimum I.D.of 1.25'.
<br /> 16.Fber optic cable and/or duct placed by plowing or trenching methods shall hare marker tape placed twdve inches(12')
<br /> drectly above.
<br /> 17.Brushing and trimming as—required.Brush,branches and refuse fran dearing opemtions shall,without dday,be removed
<br /> fran the vicinity of the right—of—way.
<br /> 18.Canstruction contractor(s)and inspector(s)shall have o copy of the permit(s)on—sfte and shall be avaaable for
<br /> inspection immediatdy upon request by the permitting authority or permitting autharity representoYrve.
<br /> 19.No excawCron,digging,tunneling,trenching,baring,plowing,installation of faclities,equipment or improvanents above,
<br /> on or beneath the surtace of ony right—of—way may begin withat a signed pertnit fran the goveming permitting authaity.
<br /> 20.Cantractors need to maintafn a minimum 5'haizontal clearonce from sewer mains and a minimum 3'horizontal
<br /> clearance from water moins ond storm draina If you cross these facil'dies at any angle between 45'and 90'.
<br /> �,� ' CONTRACTORS NOTE:
<br /> G� ��' ALL UTILITY LOCATIONS ARE APPROXIMATE
<br /> _ �L�, CONTRACTOR IS RESPONSIBLE FOR �
<br /> g�:-w � EXACT LOCATIONS. o
<br /> . s �� .• � z
<br /> 'O 8 E��c a
<br /> �,A�rrtJ i C�'Y' ,,,\�,.`� �'�9���� �V� � ,� 3
<br /> ��r�%'�Fi !'�t.���� - . . .. �"a,,,� � �� w
<br /> �
<br /> �, w
<br /> ��ot�s��� ---� ,� ..:., � r .� .; . ,. .,< � �
<br /> �
<br /> � N � � �µ o
<br /> �
<br /> Fl PHONE#: 435-623-4252 °°'D BY: GL E� OR B E R K W A S H I N�G 0 N �
<br /> CONSTRUCTION m
<br /> DATE: 02/10/15 0
<br /> NOTES AT&T CORP „
<br /> �w�' DATE: BY REVISION APP'R �
<br /> zQ � 02 10 15 JJ BASEMAP WASHINGTON 1O
<br /> � 02 10 15 KR CAD �
<br /> a �
<br /> � SNGIN6�2ING COMPANY: o
<br /> o PLOT DATE: SCALE: FILENAME & SHEET NAME: Z
<br /> �
<br /> Z NEPH(I; �'.`e�� 2 11 15 N TS 3�� � ,�` `
<br /> � E-MatLN ngTnseiingOrtnwl oom / / N 0 T E S o� �r �
<br /> W&HP# ¢4 (/��
<br /> � ,_ �
<br />
|