My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6001 EVERGREEN WAY 2018-05-15
>
Address Records
>
EVERGREEN WAY
>
6001
>
6001 EVERGREEN WAY 2018-05-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 8:36:21 AM
Creation date
5/15/2018 8:36:20 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6001
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC�IORKS PERMIT DateApplied: 1/3/2018 <br /> "�"� Public Works Permit#: PW1801-010 <br /> City of Everett Public Works Department parent Permit#: <br /> 3200 Cedar Street <br /> „�, Everett,WA 98201 Planning Reference#: <br /> 't�`f' f�'��=�s (425) 257-8810 Public Works Fee: $65 <br /> r j, <br /> i i. <br /> t ' <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> CITY OF EVERETT MILNE ELECTRIC INC <br /> 2930 WETMORE AVE 14582 172ND DR SE <br /> EVERETT, WA, 98201 MONROE, WA, 98272 <br /> PHONE: 4252578663 PHONE: 3608639617 <br /> TAX PARCEL ID#: SITE ADDRESS: 6001 EVERGREEN WAY <br /> DESCRIPTION: COE-FIBER OPTIC INSTALL - RESERVOIR#3 <br /> MID JANRUARY- INSTALL CITY OF EVERETT FIBER OPTIC CABLE FROM THE CITY OF EVERETT RESERVOIR#3 <br /> LOCATED AT 6001 EVERGREEN WAY TO AN EXISTING CABLE VAULT LOCATED AT THE SOUTHWEST CORNER OF <br /> EVERGREEN WAY AND PECKS ROAD. THE FIBER CABLE WILL BE INSTALLED IN EXISTING OVERHEAD AND <br /> UNDERGROUND PATHWAY. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett `Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Traffic Control must be done in accordance with MUTCD Standards and the Traffic Control Plan approved by City,of <br /> Everett dated 01/09/2018. - <br /> 5. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City.Standards and/or as <br /> directed by the City PW Inspector. <br /> 6. Street restoration must be done per COE Standard Drawing #326 and trench restoration per#614, or as directed by the <br /> City PW Inspector. Permanent restoration must be completed within 2 weeks of completion of utility work. <br /> 7. Full lane width grind and overlay is required for trenches greater than 100' in length, multiple cuts within a 100' length <br /> section, and/or as directed by the City PW Inspector. <br /> 8. A minimum of 5ft separation between City of Everett utilities and directional boring/pavement cuts shall be maintained. <br /> 9. Contact the City of Everett Public Works InspectorJim Knapert at 425-339-7404 prior to starting construction, to evaluate <br /> traffic control set-up, with other inspection requests, and to final the permit. <br /> 10. Coordinate with adjoining businesses/homeowners to minimize obstruction of commerce/access. <br /> 11. For any proposed night work, a Temporary Noise Variance may be needed per the City's Noise Ordinance. Please visit <br /> the following website for more information: https://everettwa.gov/1547/Temporary-Noise-Variance-Requests <br /> Public Works Permit Fee Breakdown: <br /> Misc Minor Permits And/Or Plan Reviews.................$25.00 <br /> PW Plan Review........................................................$20.00 <br /> PW Site Inspection....................................................$20.00 <br /> City ofEverett O�cial Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> � �� �jp/v expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> ppro ed for Construction ( IiC WOI'k5� 8te for and further agrees to remove same upon notice from the City and to <br /> repla public property damaged thereby. <br /> FINAL INSPECTION Date � < ',� � �Z�' ��'�v <br /> Approved as Constructed (PW Inspector) Sign ure of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIr IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.