Laserfiche WebLink
� � • <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings inciuding R2,R3,R4 over 3 stories and all R1 Revised August 2016 <br /> Project Title: Planet Fitness-Everett Date 6/22/2017 <br /> Interior Lighting System The remodeled area lighting consists of LED high bay light fixtures in the exercise areas, <br /> Description 2x4 flat panel LED lights in the 30 Minute Workout and Stretching&ABS, LED downlights <br /> in the Black Card Tanning, Hydro and Massage Areas circuited to an existing lighting <br /> control paneL <br /> Interior Lighting Power Q✓ Building Area Method ❑ Space-by-space Method <br /> Allowance Method Select method used in project <br /> Interior Lighting Controls Q✓ All C405.2.1-C405.2.8 Controls �C405.2 Exception 5 Luminaire Level <br /> Lighting Control(LLLC) <br /> � �Additional Efficiency Package Option <br /> C406.4 Enhanced digital lighting controls . <br /> To comply with C406.4,no/ess than 90%of the total installed interior lighting power shall comply with the <br /> required controls per C406.4. <br /> Dwelling Unit Interior Permanently installed interiorlighting fixfures in dwelling units comply with: QQ <br /> Lighting (�C405.2 thru C405.5 Commercial Lighting Controls and LPA <br /> Q C406.3 High Efficacy Lighting <br /> a <br /> Exterior Lighting Systern <br /> Description <br /> � ; <br /> � �� <br /> �� . <br />