Laserfiche WebLink
. ' <br /> � 2015 Washington Sta��ergy Code Compliance Forms for Commercial, R R3 over 3 stories and all R1 <br /> 2015 Washin ton State Energy Code Com liance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised January 2017 <br /> Project Information Project Title: Pacific Market Date 2/28/2018 <br /> Applicant Information. Provide contact information for individual who can respond to For Building Dept.Use <br /> inquiries abouf compliance form information provided. <br /> Company Name: Evergreen State Heat 8 A/C <br /> Company Address: 2120 Pacific Ave,Everett,WA 98201 <br /> Applicant Name: Mark Payne <br /> Applicant Phone: 425-252-3114 <br /> Project Description [] New Building [� Building Addition [� Tenant Improvement Q System Retrofit C] No System Changes <br /> eriet�ydescribe mechanical systems in Replacing 1 unit(N) with the same capacity,power requirements and gas heat as old unit..Old unit provided <br /> the text box provided sufficent heating and cooling.New unit is a1 phase 4 ton RTU. <br /> � Total Bldg Performance(TBP) <br /> This path includes all mandatory <br /> provisions per C401.2 Option 2. <br /> MECH-SUM,MECH-CHK,and C407 <br /> Energy Analysis forms required. <br /> � Load calculation summary Q MECH-LOAD-CALC Form <br /> DeSigri LOd(�CdICL11dt10riS Provide design load calculations for ail mechanical systems and equipment serving the building heating,cooling or <br /> ventilating needs.If a load calculation summary is provided with the permit documents that includes all applicable <br /> compliance information then fhe MECH-LOAD-CALC form is not required. <br /> �✓ Mechanical Plans ❑ MECH-EQ Forms(TBD) <br /> MeCI1drilCdl SCIleClUleS indicate location of equipment compliance information.If provided on plans then MECH-EQ forms are not required, <br /> however,include on plans all applicable compliance information listed in MECH-EQ tables. <br /> 'Q DOAS is required per C403.6 effective July 1,2017(office,retail,education,library and fire station occupancies) <br /> All occupied,conditioned areas shall be served by a DOAS that delivers required ventilation air in a manner that does <br /> not require space conditioning fan operation.Space conditioning fans cycled off when no heating or cooling is required. <br /> D@CliClteCl OutClOOY A1Y � Ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS(C403.6,Exception 1) <br /> System Requirements and ❑ 2entilation and space conditioning provided by a HEVAV system per C403.7 in lieu of DOAS(C403.6,Exception <br /> ) <br /> High Efficiency VAV ❑ DOAS included in project,although not required(occupancy not office,retail,education,library or fire station) <br /> �liteTridte � DOAS related allowances included in project: <br /> ❑ Prescriptive vertical fenestration maximum area allowance increased to 40%per C402.4.1.4 with 100%of <br /> conditioned floor area in building served by DOAS. <br /> [Q Exception to air economizer per"C403.3 Exception 1,include MECH-ECONO form. <br /> Q Project includes HVAC air distribution systems that provide heating and/or cooling <br /> If yes,provide a MECH-FANSYS-SUM form. <br /> Fan PoWeT � For one or more systems,the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp. <br /> If yes,provide a seperate MECH-FANSYS form foreach HVAC system exceeding fhe 5 horsepowerthreshold. <br /> Referto Section C403.2.11 and MECH-FANSYS-DOC forrequirements and exceptions. <br /> Q Hydronic chilled water :� Water-loop heat pump � No hydronic systems <br /> HVAC Hydronic Systems <br /> Q Hydronic heating water .❑ Geothermal <br /> Q C406.2 More e�cient HVAC equipment and fan systems <br /> Requires 90%of heating and cooling capacity to be equipment listed in tables C403.2.3(1)-(9)or air-to-waterheat <br /> pumps and heat recovery chillers.All equipment listed in tables C403.2.3(9)-(7)must be 15%more efficient than <br /> minimum requirements.Ail stand a/one supply,retum,and exhaust fans over 1 hp must have FEQ z 71 and must be <br /> C406 Additional Efficiency selected within 10%ofmaximum total orstatic pressure. <br /> '❑ C406.6 Dedicated outdoor air system(DOAS) <br /> �pt10riS-MeC�11ri1Cd1 Requires 90%of conditioned floor area to be served by a DOAS per C403.6 that delivers required ventilation air in a <br /> manner that does not require space conditioning fan operation. <br /> ❑ C406.7 Reduced energy in service water heating <br /> Requires 90%of floor area be in occupancy types listed in C406.7.1 and that 60%of annual hot water energy use be <br /> provided by heat pump,waste heat recovery or so/ar water-heating systems. <br /> �-"f� �"� <br /> ; � ��;`p t <br /> � ,���;� <br /> s�...�_a_ -- <br />