My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9605 EVERGREEN WAY PACIFIC MARKET 2018-05-15
>
Address Records
>
EVERGREEN WAY
>
9605
>
PACIFIC MARKET
>
9605 EVERGREEN WAY PACIFIC MARKET 2018-05-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 9:48:37 AM
Creation date
5/15/2018 9:48:33 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9605
Tenant Name
PACIFIC MARKET
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2015 Washington State Energ e Compliance Forms for Commercial,R2 and R3 over 'es and all R1-Page 7 of 7 <br /> . . <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and ali R1 Revised January 2017 <br /> Project Title: Pacific Market Date 2/2 8/2 018 <br /> The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the <br /> Washington State Energy Code,Commercial Provisions. <br /> Applicable Location in Building Department <br /> (yes,no,na) Code Section Code Provision Information Required-Must be in permit documents Documents Notes <br /> C403:7, APP�ication of single duct �ndicate VAV terminal types on plans;verify fan-powered terminal units oniy serve perimeter <br /> Item 11 and fan-powered terminal Zones with envelope loads;verify all other zones are served by single duct terminai units <br /> units <br /> C403.7, Fan-powered terminal unit Indicate DDC controls are configured to automaticaliy reset the primary supply air cfm setpoint <br /> Item 12 primary air reset of all fan-powered terminal units to the minimum required to maintain veniilation during <br /> occupied heating or deadband,based upon the VAV air handling unit OSA ventilation fraction <br /> For spaces>150 sf with occupant density t 25 people/1000 sf,indicate space is served by a <br /> C403.7, High occupancy space dedicated terminal unit with DCV control that resets terminai unit ventilation setpoint;also <br /> Item 13 controls indicate occupancy sensor control that automaticaily reduces minimum ventilation to zero and <br /> sets back room heating and cooling setpoints by z 5°F <br /> For server,electronic equipment,telecom or similar spaces with cooling loads>5 W/sf, <br /> C403.7, Dedicated HVAC systems indicate spaces are served by independent HVAC systems that are separate from HPVAV <br /> Item 14 systems serving rest of building;indicate dedicated HVAC systems have air economizer <br /> controls or energy recovery per C403.3 Exception 9 <br /> Indicate whether systems are served by a high efficiency heating water plant,or a high <br /> efficiency chilled water plant <br /> If complying via high e�ciency heating water plant:Indicate all VAV terminals have hydronic <br /> heating coils served by heating water system with either gas-fired boiler(s)with thermal <br /> C403.7, Central plant e�ciency efficiency>_90%,air-to-water heat pumps,or heat recovery chiilers <br /> Item 15 If complying via high efficiency chilled water plant:Indicate all VAV air handlers have cooling <br /> coils served by chillers with rated IPLV e�ciency that exceeds WSEC listed IPLV by at least <br /> 25%per Table C403.2.3(7)(note water-cooled IPLV is max,all others are min);indicate <br /> smallest chiller or compressor in plant is_<20%of total plant capacity,or provide thermal <br /> storage sized for<_20%of total plant capacity <br /> C403.7, Fault detection and �ndicate DDC system includes a fault detection and diagnostics(FDD)system configured to <br /> Item 16 diagnostics monitor operation and provide fault reporting of required parameters for all VAV air handiers <br /> and VAV air terminal units in the HPVAV system <br /> HVAC Equipment Energy Use Metering <br /> HVAC equipment energy For new buildings>50,000 sf and building additions>25,000 sf,verify energy use metering of <br /> C409.3.1 use metering all equipment used to provide space heating and cooling,dehumidification and ventilation will <br /> be provided per C409;indicate equipment eligible for exception <br /> Documentation and System Specific Requirement To Support Commissioning <br /> Indicate that all mechanical systems,equipment,and controls for which the WSEC requires <br /> control functions and /or configuration to pertorm specific functions are required to be <br /> commissioned; <br /> C408.2 Scope of inechanical <br /> systems commissioning For buildings with z 240,000 Btu/h total output cooling capacity or t 300,000 Btu/h total output <br /> heating capacity,indicate that all mechanical systems regardless of individual capacity are <br /> required to be commissioned;or provide building heating/cooling capacity calculation <br /> demonstrating eligibility for exception <br /> Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical <br /> systems; <br /> C403.2.10 Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 <br /> C408.1.1 Commissioning including:narrative description of activities,responsibilities of the Cx team,schedule of <br /> C408.1.2 requirements in construction activities including verification of project close out documentation per C103.6,and conflict of <br /> C408.1.4.2 documents interest plan(if required); <br /> C103.6 Include in general summary that a Cx project report or Compiiance Checklist(Figure <br /> C408.1.4.2)shall be completed by the Certified Cx Professional and provided to the owner <br /> prior to the final mechanical inspection. <br /> Air system and hydronic Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances <br /> C408.22 system balancing defined in the specifications;indicate systems shali be balanced in a manner to first minimize <br /> throttling losses,then adjusted to meet design flow conditions <br /> C408.2.2.1 Air system balancing Indicate devices that provide the capability to balance all supply air outlets,zone terminals and <br /> devices air handling equipment requiring system balancing <br /> C408.2.22 Hydronic system balancing Indicate devices that provide the capability to isolate,balance and measure flow across all <br /> devices hydronic equipment requiring system balancing including heating and cooling coils and pumps <br /> C408.2.3 Functional perFormance Idenfrfy in plans and specifications the intended operation of all equipment and controls during <br /> testing criteria all modes of operation,including interfacing between new and existing-taremain systems <br /> Project Close Out Documentation <br /> Documentation and project Indicate in plans that project close out documentation and training of building operations <br /> C103.6 close out submittal Personnel is required for all mechanical components,equipment and systems governed by <br /> requirements this code;indicate close out documentation shall include:record documents,O&M manuals, <br /> applicable WSEC compliance tbrms and calculations <br /> /,____ _ -__;� \ <br /> , , <br /> ,t r v� �l � �� <br /> F ,� 1 � / <br /> ,,�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.