Laserfiche WebLink
PUBLIORKS PERMIT Date Applied: 11/22/2017 <br /> City of Everett Permit Services Public Works Permit#: PW1711-029 <br /> /• A <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: B1711-029, B1805-035 <br /> Everett,WA 98201 Planning Reference#: SEPA18-002 <br /> (425) 257-8810 Public Works Fee: $1,080.22 <br /> 29 NOV 2Q18 <br /> OWNER NAME AND ADDRESS: • k . RACTOR NAME AND ADDRESS: <br /> S R KLEIN FISH-ON INVESTMENT LLC It) - `iNAL GA NEY CONSTRUCTION <br /> PO BOX 3830 APPROVAL 810 :ROADWAY <br /> EVERETT, WA, 98213 EV= ETT, WA 98203 <br /> JUN 16 2022 <br /> PHONE: PH• E: 4253555500 <br /> TAX PARCEL ID#: 280424002031:->' ARCHIVE III SIT .DDRESS: 10611 EVERGREEN WAY <br /> DESCRIPTION: SITE WORK FOR ADDITIONS TO SHOWROOM &SERVICE BAY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 6/13/2018. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 prior to starting construction for a <br /> consultation, to evaluate Erosion/Sedimentation control set-up, and with all other inspection requests. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon <br /> completion of the project prior to final approval of the permit. 1-'9 ram; <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to bettat'ked"O`nto`rciati iiay."`'� <br /> 8. Protect all existing underground utilities during construction. b", '!R =_; <br /> 9. It is the applicant/owner's responsibility to ensure that stormwaterF .ano , /re iinpeivroi sur!ces will be <br /> managed on-site in a manner that does not adversely affect neighboring p'i'dp€r s;'inclMIN! e City's right-Ovay and/or <br /> easements and the improvements located therein. o, ; <br /> 10. On-site water main will be staked within an easement to the City. T�easement docu ration will be sur mitt a-,l�t'_. <br /> q the <br /> City prior to issuance of permits and must be recorded by the project teen with a copy of the recorded document su"T5rated <br /> to the City prior to final approval/close out of the permit. ;~ <br /> 11. A Landscape Inspection is required by the Planning DepartnnentRi to final by theRRtjlftWorks In, pector. Cont:Cct <br /> the Planning Department at 425-257-2273 to schedule the inspection r r µ--a <br /> 12. This permit must be finaled in order to close out this permit/grant, er�i ;0:VDt y;w•C 'i fW:11-ispection line to <br /> request a Final for this permit when all items have been completed. ° ; r.41 <br /> 1.:. r'•..l <br /> Public Works Permit Fee Breakdown: , .) <br /> Paving(11,837SF) $59.19 <br /> Erosion Control $200.00 <br /> PW Plan Review $273.68 <br /> PW Sitelnspection $547.35 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> / The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> /O/, ! i i ' expenses,or causes of action that may arise because of installation and <br /> / maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace p lic property damaged thereby. <br /> FINAL INSPECTION Date egGst i4 NOV Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> p/Le <br />