Laserfiche WebLink
• 411 <br /> Fee. Update if any of your stormwater design changes the original <br /> document that was submitted. <br /> The Permit Counter is open Monday through Friday from 7:30am-12:OOpm and <br /> from 1:00pm-4:00pm(closed between 12:00 pm-1:00 for lunch. <br /> The Easement and Cost Estimate forms will be submitted upon Construction Plan <br /> Approval. <br /> b. Please see all redlines on the attached plans for required corrections in addition to <br /> all comments listed below. Frequently,redlines will be stand-alone and will not <br /> have an associated item in this corrections letter. Likewise, comments below may <br /> not have associated redlines. <br /> All redlines on the plans have been addressed. <br /> c. See all redlines on the attached Stormwater Site Plan for Klein Honda. The <br /> project must comply with most current version of the City's Stormwater <br /> Management Manual (currently the Washington Department of Ecology's 2014 <br /> Stormwater Management Manual for Western Washington)and Chapter 4 of the <br /> Design and Construction Standards and Specifications (DCSS). <br /> All redlines in the Stormwater Site Plan have been addressed. <br /> d. See redlines on Sheet 7 of 7 for comments on revising the water easement <br /> dimensions to meet City requirements. <br /> i. Show 15' water easement to the City of Everett around the water lines <br /> from the property line to the back side of the meter(s)and around the fire <br /> hydrant. The easement shall be 5' on one side and 10' on the other. The <br /> ortion of the easement around the hydrant shall extend 5' beyond the <br /> portion <br /> he water easement is now shown with the correct area. <br /> 2. The comments below were generated from the project's Traffic Reviewer. If you have <br /> any questions regarding these comments,please contact Michael Brick with the City of <br /> Everett Traffic Engineering Department. <br /> a. The site plan is acceptable to Traffic Engineer as submitted. If any subsequent <br /> modifications affect the new parking area or site access onto Evergreen Way <br /> additional review will be required. <br /> Noted. <br /> b. The Traffic Impact Analysis prepared by Gibson Traffic Consultants required <br /> additional support data. On Pg 1, Para 3 there is reference to a 35%pass-by rate <br /> applied to the trip generation calculations for this project. The City of Everett has <br /> not reviewed or approved the referenced analysis submitted to Snohomish County <br /> PO Box 1478 • Everett, WA 98206 • Phone: (425)303-9363 /� <br /> Fax: (425) 303-9362 • Email:info@insightengineering.net / <br />