Laserfiche WebLink
Envelope Summary ENV-SUM <br /> 2015 Seattle Energy Code Compliance Forms for Commercial Buildings including R2, R3,&R4 over 3 stories and all R1 Revised Feb 2017 <br /> Project Info Project Title: Klein Honda Addition Date 10/25/2017 <br /> forms Applicant Information. Provide contact information for individual who can For SDCI Use <br /> Co not <br /> Compliance a respond to inquiries about compliance form information provided. <br /> requipassword to use. Company Name: <br /> Instructional and Company Address: <br /> calculating cells are <br /> write-protected. Applicant Name: <br /> Applicant Phone: <br /> Applicant Email: <br /> Project Description ❑New Building ❑ Addition ❑ Alteration <br /> Occupancy Type *All Commercial 0 Group R-All R1 and R2, R3,R4 over 3 stories 0 Mixed Use <br /> Selection required to enable forms. <br /> Envelope Compliance Path 0 Prescriptive 0 Component Performance <br /> Selection required to enable forms. <br /> Heating Energy Source 0 Electric Resistance or Fossil Fuel ® Other Heating Energy Source <br /> Refer toSection C402.4 for details and Prior to 1/1/2018 all projects should specify Other HeatingEnergy <br /> exceptions p � p � <br /> Component Performance <br /> l� �Standard 0 Change of Occupancy/Conditioning 0 Semi-heated <br /> Calculation Type <br /> ❑Additional Efficiency Package Option-C406.8 Enhanced Envelope <br /> To comply,demonstrate building thermal envelope performance is 15%lower than the Target UA, <br /> or 30%lower than Target UA if C411 Renewable Energy,exception 3 is also selected <br /> Selection required to enable ENV-UA ❑C411 Renewable Energy-Exception 3 <br /> and ENV-SHGC forms. To comply,demonstrate building has primarily non-central electric resistance heat and thermal <br /> envelope performance is 15%lower than the Target UA <br /> Air barrier testing per Section C402.5.1.2 ❑Air barrier testing not required <br /> included in project scope <br /> Air Barrier Testing ❑Additional Efficiency Package Option-C406.9 Reduced Air Infiltration <br /> To comply,demonstrate that measured air leakage of building envelope does not exceed 0.22 <br /> cfm/ft2(air barrier surface area)under test pressure of 0.3 inch w.g.,or 0.25 cfm/ft2 for Group <br /> R occupancy buildings <br /> Vertical Fenestration and Total Vertical Gross Exterior <br /> Skylight Area Calculation Fenestration Above Grade %Vertical <br /> (rough opening) divided by Wall Area times 100 equals Fenestration <br /> Prescriptive Path-Enter values for <br /> vertical fenestration,skylights,gross walls 2662 .0 — 7182 .0 X 100 = 3 7 .1% <br /> and roof on this ENV-SUM worksheet. <br /> Component Performance-Enter values Gross Exterior <br /> in ENV-UA and/or ENV-UA-GROUP-R Total Skylight divided by Roof Area times 100 equals %Skylight <br /> worksheet. These values auto-fill from <br /> ENV-UA and are write-protected on ENV- 0 .0 - 0. 0 X 100 = <br /> Exempt Single Glass if complying prescriptively exempt area MUST also be <br /> Area included in total vertical fenestration in cell C25. If complying <br /> Always enter exempt glazing area here. via component performance do not enter exempt glazing on <br /> ENV-UA or ENV-SHGC. <br /> Maximum Prescriptive Vertical Fenestration (0/s) 40%per C402.3.1.3 <br /> Vertical <br /> Fenestration VERTICAL FENESTRATION AREA COMPLIES <br /> Area <br /> Fenestration Area Compliance <br /> Skylight Area <br />