My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11311 EVERGREEN WAY 2018-05-15
>
Address Records
>
EVERGREEN WAY
>
11311
>
11311 EVERGREEN WAY 2018-05-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 11:08:56 AM
Creation date
5/15/2018 11:08:55 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
11311
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: 7/10/2017 <br /> Public Works Permit#: PW1707-008 <br /> ' City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: <br /> �� � Everett, WA 98201 <br /> Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 65.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> JET CITY RE INVESTMENT LLC <br /> PO BOX 6531 <br /> PORTSMOUTH NH 03801 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# 00442900202403 SITE ADDRESS: 11311 EVERGREEN WAY <br /> CONCRETE SIDEWALK PANEL REPLACEMENT <br /> Replace a panel of concrete sidewalk in City of Everett right-of-way due to replacing storm drain connection from property. <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works <br /> Department dated 7/10/2017. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 w <br /> prior to starting construction for a consultation, to evaluate Erosion/Sedimentation �I <br /> control set-up, and with all other inspection requests. M�I <br /> 6. Install and maintain erosion control measures per City of Everett Standards. Remove � <br /> upon completion of the project prior to final approval of the permit. � <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto O <br /> roadway. � <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Restore concrete sidewalk per City of Everett Standards, particularly Standard 'Z <br /> Drawing#312, and as directed by the PW Inspector. O <br /> 10. This permit must be finaled by the Public Works Inspector when the work in <br /> complete. Call the inspection line at 425-257-8881 by 4pm one business day before the �..� <br /> inspection is to take place. � <br /> Public Works Permit Fee Breakdown: � <br /> Paving (Sidewalk Restoration)..................$45.00 �I <br /> PW Site Inspection........:...........................$20.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> causes of action that may arise because of installation and maintenance of the <br /> Approved for Construction Dat2 �mprovement or other right-of-way use hereto applied for and further agrees to <br /> remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFfER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLEfiON, THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.