My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11311 EVERGREEN WAY 2018-05-15
>
Address Records
>
EVERGREEN WAY
>
11311
>
11311 EVERGREEN WAY 2018-05-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 11:08:56 AM
Creation date
5/15/2018 11:08:55 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
11311
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, " PUBLIC WORICS DEPARTMENT � ��� ' �� � <br /> � Utilities Division,3200 Cedar Street <br /> E(i Everett WA 98201 <br /> 425-257-8800 <br /> • <br /> Receipt # Date Paid <br /> X Cost of Work Order $2302.00 Work Order# <br /> Cost of Service Order Service Order# <br /> Contact Pexson Josh Steverls Telephone# 425 422-9496 <br /> Requested By Kirk Brooks Date of Request 7-5-2017 <br /> Property Owner(name) Matt Landry <br /> Charge Cost to(name if different than owner) Stevens Customs LLC <br /> Address 8209 Spada Rd City Snohomish Zip 98290 <br /> Installation Location 1'1311 Evergreen Way ��� <br /> Installation type/description/size/etc. 6" tap on 12" water main.Tap is for a hydrant owend by <br /> Mukilteo C.O.E. wiil do tap and contractor will install 6" lateral and hydrant. Estimate is for <br /> contractor to excavate, shore, restore and provide traffic control. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notifv the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for schedulin and parts procurement <br /> Whenever the esiimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> adrninistrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> '�Deposit must be paid prior to ordering parts or scheduling work. <br /> '�Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $1209.00 cr. Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $713.00 Matt Welborn <br /> Equipment Rental $270.00 Randy Allen <br /> Paul McKee <br /> Tax $110.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration - Sabrina Fandler <br /> TOTAL $2302.00 Benyam Stephanos <br /> Prepared by: � Jim S oon i��,,,, Date Estimate Prepared 7/20/2017, • <br /> Accepted by: Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est�2015\11311 Evergreen Way CEFP <br /> lofl <br />
The URL can be used to link to this page
Your browser does not support the video tag.