Laserfiche WebLink
INSPECTION REPORT <br /> Date Permit: 6 �� °'D� <br /> Contractor: /�p L-� 6 '�/�2� <br /> Owner: <br /> Site Address: � 7�P ��'�/ """eG'S � � G�.� �t n/ � �G(' <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER g[ound ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing, ❑Rough In '�.6ough in <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: � D �O ���� T�� I <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> OK FOR C.O. ❑ VIOLATION <br /> UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> L�[ � �� l �'J��c,l <br /> _ � � � <br /> Inspector: Date: L �~ � ~ <br /> � EIR(10/06) - � TABAR,-INC. � <br />