Laserfiche WebLink
2015 Washington State Energy Code Compliance Forms for Commercial,R2 and R3 over 3 stories and all R1 age 7 of 7 <br /> ■ � <br /> ,2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all Ri Revised January 2017 <br /> ProjectTitle: BuildingshellHVAC(formerMacy's) Date 6/30/2017 <br /> The following information is necessary to check a permft application for compliance with the mechanical systems and equipment requirements of the <br /> Washington State Energy Code,Commercial Provisions. <br /> Applicable Code Section Code Provision Information Required-Mustbe in permit documents Location in Building Department <br /> es,no,na Documents Notes <br /> Application of single duct <br /> C403.7, Indicate VAV terminal types on plans;verify fan-powered terminal units only serve perimeter <br /> N�A Item 11 and fan-powered terminal Zones with envelope loads;verity all other zones are served by single duct terminal units <br /> units y <br /> C403.7, Fan-powered terminal unit �ndicate DDC controls are configured to automatically reset the primary supply air cfrn setpoint <br /> N�A Item 12 primary air reset of all fan-powered terminal units to the minimum required to maintain ventilation during <br /> occupied heating or deadband,based upon the VAV air handling unit OSA ventilation fraction <br /> For spaces>150 sf with occupant density>_25 people/1000 sf,indicate space is served by a <br /> N/A C403.7, High occupancy space dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint;also <br /> Item 13 controls indicate occupancy sensor control that automatically reduces minimum ventilation to zero and <br /> sets back room heating and cooling setpoints by>_5°F <br /> For server,electronic equipment,telecom or similar spaces with cooling loads>5 W/sf, <br /> wA C403.7, Dedicated HVAC systems �ndicate spaces are served by independent HVAC systems that are separate from HPVAV <br /> Item 14 systems serving rest of building;indicate dedicated HVAC systems have air economizer <br /> controls or energy recovery per C403.3 Exception 9 <br /> Indicate whether systems are served by a high efficiency heating water plant,or a high <br /> efficiency chilled water plant <br /> If complying via high efficiency heating water plant:Indicate all VAV terminals have hydronic <br /> heating coils served by heating water system with either gas-fired boiler(s)with thermal <br /> N�A C403.7, Central plant efficiency efficiency z 90%,air-to-water heat pumps,or heat recovery chillers <br /> Item 15 If complying via high efficiency chilled water plant:Indicate all VAV air handlers have cooling <br /> coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least <br /> 25%per Table C4032.3(7)(note water-cooled IPLV is max,all others are min);indicate <br /> smallest chiiler or compressor in plant is<_20%of total plant capacity,or provide thermal <br /> storage sized for<_20%of total plant capacity <br /> C403.7, Fautt detection and Indicate DDC system includes a fault detection and diagnostics(FDD)system configured to <br /> wA Item 16 diagnostics monitor operation and provide fauR reporting of required parameters for all VAV air handlers <br /> and VAV air terminal units in the HPVAV s stem <br /> HVAC Equipment Energy Use Metering <br /> HVAC equipment energy For new buildings>50,000 sf and building addRions>25,000 sf,verity energy use metering of <br /> N/A C409.3.1 use metering all equipment used to provide space heating and cooling,dehumidification and ventilation will <br /> be provided per C409;indicate equipment eligible for exception <br /> Documentation and System Speci�c Requirement To Support Commissioning <br /> Indicate that all mechanical systems,equipment,and controls for which the WSEC requires <br /> control functions and /or configuration to perform specific functions are required to be <br /> Scope of inechanical <br /> commissioned; M1 <br /> C4082 systems commissioning For buildings with>_240,000 Btu/h total output cooling capacity or>_300,000 Btu/h total output <br /> Yes heating capacity,indicate that all mechanical systems regardless of individual capacity are <br /> required to be commissioned;or provide building heating/cooling capacity calculation <br /> demonstrating eligibility for exception <br /> Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical <br /> systems; <br /> C403.2.10 Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 <br /> C408.1.1 Commissioning including:narrative description of activities,responsibilities of the Cx team,schedule of <br /> C408.12 requirements in construction activities including verification of project close out documentation per C103.6,and conflict of <br /> Yes C408.1.4.2 documents interest plan(if required); M1 <br /> C103.6 Include in general summary that a Cx project report or Compliance Checklist(Figure <br /> C408.1.4.2)shall be completed by the Certified Cx Professional and provided to the owner <br /> prior to the final mechanical inspection. <br /> Air system and hydronic Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances <br /> Yes C408.22 system balancing defined in the specifications;indicate systems shall be balanced in a manner to first minimize <br /> throttling losses,then adjusted to meet design flow conditions M1 <br /> Yes C408.2.2.1 Air system balancing Indicate devices that provide the capability to balance all supply air outlets,zone terminals and <br /> devices air handling equipment requiring system balancing M� <br /> N/A C4082.2.2 Hydronic system balancing Indicate devices that provide the capabiliry to isolate,balance and measure flow across all <br /> devices hydronic equipment requiring system balancing including heating and cooling coils and pumps <br /> Yes C408.2.3 Functional performance Identify in plans and specifications the intended operation of all equipment and controls during <br /> testing crfteria all modes of operation,including intertacing between new and existing-to-remain systems M� <br /> Project Close Out Documentation <br /> Documentation and project �ndicate in plans that project close out documentation and training of building operations <br /> Yes C103.6 close out submittal personnel is required for all mechanical components,equipment and systems govemed by this <br /> requirements code;indicate close out documentation shall include:record documents,O&M manuals, <br /> applicable WSEC compliance forms and calculations Mi <br />