My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2922 FOREST VIEW DR 2018-05-16
>
Address Records
>
FOREST VIEW DR
>
2922
>
2922 FOREST VIEW DR 2018-05-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2018 1:43:14 PM
Creation date
5/16/2018 1:43:10 PM
Metadata
Fields
Template:
Address Document
Street Name
FOREST VIEW DR
Street Number
2922
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�iz�iz�, � b i <br /> �5 City of Everett i`'�� <br /> ..E:48:15PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. CliO3-004 Site Address 2922 I'OREST VIEW DR <br /> Applied 3/11/2013 Applicant Lot <br /> Approved 3/12/2013 Orvner OSS STEVEN&OPAI, Blocl: <br /> Issued 3/23/2013 Contractor IZAINIER VIEW CONS'I'&RFNG Tract <br /> Parent Permit No. Description 2 STORY R�SID1:i�TTIAI,ADDITION <br /> Notes LIVING SPACE,GARAGE,llECK <br /> Scheduled Comoleted Tvne Inspector Result Remarlcs Insnector's Comments <br /> 5/2/2013 5/2/2013 Foundation BSM Approval Sec notes Install hold do�vns per approved plans <br /> OK to��our after rcmoving standing watcr. <br /> 5/2/2013 5/2/2013 Footing 13SM Approval Sce Foundation <br /> inspection 5/2/13 <br /> 6/24/2013 Consuftatioii I3SM Framin� llems discussed: <br /> consultation,see 1)Protection of the"1"bcam in garage(one <br /> notes hour required and tlie owner wants to leave <br /> it expose�. The o�vner may pursue <br /> alternatives to wrapping witl�drywall <br /> 2)6x10 posts were poured�vifhout an <br /> inspection of lhe supporting pads. <br /> 3)Exterior shcar nailing pattern. <br /> 4)Inspection schediding sequence;tlic <br /> contractor will call for an exterior shear <br /> nailing inspection wl�en ready. <br /> 7/1�/2013 7/15/2013 SliearNailing BSM Approval See notes Exterior shear nailing is accepted,OK to <br /> proceed <br /> 9/24/2013 9/24/2013 P1UgI2oughIn SDP Approval <br /> � ( i <br /> � <br /> 1NSP 12 ����:; <br />
The URL can be used to link to this page
Your browser does not support the video tag.