• <br /> 9 ' <br /> • <br /> • <br /> Application and Certification for Payment <br /> To(Owner): City of Everett Purchasing Contract No.: N/A Application No.: 2(FINAL) <br /> 3200 Cedar Street#5 Work Order No.: 86 • <br /> Application Date: 4'10/2018 <br /> Everett,WA Contract PO No.: JC17129 Payment Period: 3/17/18-3/31/18 <br /> • <br /> WO PO No.: N/A <br /> From(Contractor): Forma Construction Company <br /> • <br /> • <br /> 1016 1st Avenue South Ste#400 <br /> Seattle,WA 98134 <br /> CONTRACTOR'S APPLICATION FOR PAYMENT CONTRACTOR'S CERTIFICATION <br /> Application is made for Payment as shown below: The undersigned Contractor certifies that to the best of Contractor's knowledge, <br /> information,and belief,the Work covered by his Application for Payment has <br /> 1. Original Work Order Sum $ 44,478.11 been completed in accordance with the Contract Documents and in a good and <br /> 2. Net Change(s)by Change Order(s) $ 26,756.11 workmanlike manner by appropriate means;that all amounts,including applicable <br /> sales tax,have been paid by Contractor for Work for which previous Certificates <br /> 3. Total Work Order Sum(Line 1+Line 2) $ 71,234.22 of Payment were issued and payment received from the Owner,that the prevailing <br /> 4. TOTAL EARNED(Completed Work) $ 71 234 22 wages have been paid in accordance with the pre-filed statement or statements of <br /> intent to pay prevailing wages;and that payment as shown herein is now due. <br /> 5. Balance to Complete(Line 3-Line 4) • <br /> $ - <br /> 6. RETAINAGE on TOTAL EARNED $ - <br /> 7. Total Earned Less Retainage(Line 4-Line 6) $ 71,234.22 <br /> • <br /> 8. Previously Approved(Line 7 from Previous Application) $ 67,672.51 CONTRACTOR: <br /> 9. Current Amount Due(Line 7-Line 8) $ 3,561.71 By: T-Q �6, Wm,- Date: 4/10/2018 <br /> 10. 9.7%WA State Sales Tax,if applicable(Total Applied to Date) $ 345.49 CITY OF EVERETT CERTIFICATE FOR PAYMENT <br /> 11. Less WSST Previously Paid $ - <br /> 12. WSST Due this Period(Line 10-Line 11) $ 3 '49 In accordance with the Contract Documents and based on observations at the <br /> site,review of Contractor's record drawings as of the date of this Application,the <br /> Resident Engineer certifies to the Owner that to the best of his/her knowledge, <br /> 13. Total Payment Due with WSST(Line 9+Line 12) $ ,. 3,907.20 information and belief,the Work has progressed as Indicated and in accordance <br /> with the Contract Documents,that all required inspections have been performed, <br /> Retainage Rate 0% and the Contractor is entitled to payment in the Amount Certified below. <br /> AMOUNT CERTIFIED <br /> (attach explanation if amount certified differs from the amount applied for) <br /> CITY OF EVERETT: <br /> By: Date: <br /> Project Manager <br /> This Certificate is not negotiable.The AMOUNT CERTIFIED Is payable onlyto the Contractor named herein. Issuance,payment and acceptance of payment are without prejudice to any rights of the Owner or <br /> Contractor under this Contract. <br /> • <br /> 96 <br />