Laserfiche WebLink
Stormwater Site Plan Report <br /> MSD 2016 Portables — ACES High School <br /> Minimum Requirement#2: Construction Stormwater Pollution Prevention (CSWPP) <br /> The CSWPP consists of two parts: the SWPPP plan drawings in the civil drawing set and the <br /> narrative in this document. See Section IX. <br /> SECTION II. PLOT PLAN <br /> The civil engineering plans include all the plot plan information. <br /> SECTION III. PRELIMINARY CONDITIONS SUMMARY <br /> The property is 49.26 acres in size and there is an existing portable classroom located where the <br /> new portable building will be. The school site is rather flat, but the general area slopes down to <br /> the south and east to a tributary to North Creek. <br /> Because this project will replace an existing portable building in the same location, runoff <br /> conditions will not be changed by this project. � <br /> SECTION IV. OFF-SITE ANALYSIS <br /> Upstream: The school site is fully developed with catch basins and a piped drainage system and <br /> it sits on a gentle drainage divide, so runoff does not drain onto the site from uphill. <br /> Downstream: The runoff from the new portable's roof, ramps, and walkways will drain to the <br /> existing storm drainage system in the same manner as the existing portable being replaced does. <br /> SECTION V. PERMANENT STORMWATER CONTROL PLAN ANALYSIS AND DESIGN <br /> Not applicable. This project will not change the site's impervious surface coverage. <br /> SECTION VI. SPECIAL REPORTS AND STUDIES <br /> No special reports or studies were conducted for this project. <br /> SECTION VII. BASIN AND COMMUNITY PLANNING AREAS <br /> This project is not subject to any specific basin or community planning area requirements. <br /> SECTION VIII. OTHER PERMITS <br /> No other permits, beside those required by the City of Everett are anticipated for this project. <br /> SECTION IX. EROSION AND SEDIMENT CONTROL PLAN <br /> Because the site is already prepared for a portable classroom, the risk of construction-related <br /> erosion is minimal. Some trenching will be required for utility connections for the new portable <br /> classroom, and erosion control notes are included on the plans addressing erosion control these <br /> elements, if needed. However, the erosion risk is low for this project due to the timing, and the <br /> fact that the portable must be in place before the start of school in September. <br /> SECTION X. BOND QUANTITIES WORKSHEET, RETENTION/DETENTION FACILITY <br /> SUMMARY SHEET AND SKETCH, AND DECLARATION OF COVENANT <br /> Not applicable. <br /> SECTION XI. MAINTENANCE AND OPERATIONS MANUAL <br /> Not Applicable. <br /> 2 TEC, Inc. <br />