Laserfiche WebLink
Cindy Bergsma <br /> From: Steve Banks <br /> Sent: Thursday, July 20, 2017 3:50 PM <br /> To: Engineering / Public Services <br /> Subject: RE:Aces HS - Electrical Permit Application <br /> Based on the limited information as presented it sounds like no plan and review for electrical is required. <br /> Thank you, <br /> Steve Ba n ks <br /> Electrical Inspector <br /> Ciry of Everett Public Works Department <br /> 3200 Cedar St, Everett, WA 98201 <br /> Office: 425-257-8810 � Direct: 425-259-7270 <br /> Email: SBanksCa�everettwa.gov <br /> ... �f��d�'�' <br /> The�Permit Services Counter is located on the 2nd Floor. <br /> Hours of Operation: Monday-Friday 7:30am -12:OOpm and 1:OOpm-4:OOpm. <br /> All emails, and attachments, sent to and from City of Everett are Public <br /> Records and may be subject to public disc%sure pursuant to RCW 4Z.56. <br /> _ _ _ _ ___ _ _ _ <br /> From: Engineering / Public Services <br /> Sent: Thursday, July 20, 2017 6:59 AM <br /> To: Steve Banks; Michael Bearda <br /> Subject: FW: Aces HS - Electrical Permit Application <br /> Do you agree with this contractors statement that no formal drawings are needed for this school? <br /> From: Jack McGann [mailto:jackmcgannCa�mcgannelectric.com] <br /> Sent: Wednesday, July 19, 2017 3:25 PM <br /> To: Engineering / Public Services; 'AJ Wiltrout' <br /> Subject: RE: Aces HS - Electrical Permit Application <br /> Attached is the architectural site plans and the buildings factory drawings. This project consists of disconnecting a <br /> stand-alone 200amp service to a portable that was demolished 1 week ago and the connection of the new 200amp <br /> service for the attached building.This should be an over the counter permit. No formal electrical drawings have been <br /> prepared aside from the manufacturers LNI set prepared for modular buildings. <br /> Please let me know if you have any other questions. <br /> Thankyou <br /> Jack McGann <br /> McGann Electric <br /> 1 <br />