My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA State Dept of Ecology 5/1/2018
>
Contracts
>
6 Years Then Destroy
>
2019
>
WA State Dept of Ecology 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2018 11:12:49 AM
Creation date
5/17/2018 11:12:41 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
State of Washington Department of Ecology
Approval Date
5/1/2018
Council Approval Date
4/18/2018
End Date
6/30/2019
Department
Planning
Department Project Manager
Karen Stewart
Subject / Project Title
Periodic Review of Shoreline Master Program
Tracking Number
0001229
Total Compensation
$30,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> CITY <br /> MI DEPARTMENT OF <br /> sow <br /> ECOLOGY <br /> NW" State of Washington <br /> Agreement No. SEASMP-1719-EverPD-00013 <br /> SHORELANDS SHORELINE MASTER PROGRAM(1719)AGREEMENT <br /> BETWEEN <br /> THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br /> AND <br /> CITY OF EVERETT-PLANNING DEPARTMENT <br /> This is a binding Agreement entered into by and between the state of Washington,Department of Ecology, <br /> hereinafter referred to as"ECOLOGY,"and City of Everett-Planning Department,hereinafter referred to as the <br /> "RECIPIENT,"to carry out with the provided funds activities described herein. <br /> GENERAL INFORMATION <br /> Project Title: Shoreline Master Program—Periodic Review <br /> Total Cost: $30,000.00 <br /> Total Eligible Cost: $30,000.00 <br /> Ecology Share: $30,000.00 <br /> Recipient Share: $0.00 <br /> The Effective Date of this Agreement is: 07/01/2017 <br /> The Expiration Date of this Agreement is no later than: 06/30/2019 <br /> Project Type: Periodic Review of the Shoreline Master Program <br /> Project Short Description: <br /> The RECIPIENT will complete a periodic review of the Shoreline Master Program(SMP)that is developed and <br /> adopted in a manner consistent with requirements of the Shoreline Management Act(SMA),RCW 90.58,and <br /> its implementing rules,WAC 173-26,including the Shoreline Master Program Guidelines(Guidelines). <br /> Project Long Description: <br /> The purpose of the SMP periodic review is (a)To assure that the master program complies with applicable law <br /> and guidelines in effect at the time of the review,and(b)To assure consistency of the master program with the <br /> local government's comprehensive plan and development regulations adopted under RCW 36.70A,if <br /> applicable.Local governments should also consider amendments needed to address changed circumstances,new <br /> information or improved data. <br /> Overall Goal: <br /> Periodic Review Checklist and draft SMP amendment or Findings of Adequacy. <br />
The URL can be used to link to this page
Your browser does not support the video tag.