Laserfiche WebLink
8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this <br /> proposal. <br /> NOC Application Forms: Forms P,R,S,NOC Worksheet and Environmental Checl:list <br /> 9. Do you know whether applications are pending for governmental approvals of other proposals dircctly affecting the property <br /> covercd by your proposal? If yes,explaiti. <br /> No <br /> 10. List any aovernment appro��als or permits that will be needed for your proposal,if known. <br /> No <br /> l 1. Give brief,complete description of your proposal,including the proposed uses and the size of the project and site. There are <br /> several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those <br /> answers on this pa�e. (Lead agencies may modify this form to include additional specific information on project description.) <br /> Eldorado Stone Operations, LLC (Eldorado) owns and operates � facility in Cv-nation, Washington whicb has been Qranted an <br /> Air Quality Permit Exemption. Eldorado is now planning to construct a similar facility in �verett, Washington. The E��erett <br /> facility will make molds for arclutectural and decorative stone products are designed and inanufactured. One of the critical steps <br /> in the process of prcparing the molds involves the use of pol��urethane foam as support for latex�nolds. Polyurethane foam forms <br /> as the result of introducin�two sep�u-atc components into a mold in a one-to-one mixture and allowing them to react.�Idorado is <br /> planning to install an injection molding booth that will be equipped with a fan to remove any VOCs generated by�he process and <br /> a direct natural�as-fired air make-up unit to rcp]ace the air that is rcmovcd by the fan.Thc purpose of this letter and attachcd <br /> application package is to explain the tcchnic�al �ispects and specifications of the proposed installation and reyuest an excmption <br /> firom the requirement Yo obtain an Order of Approval. Specifically, the bases for the request are Regulation I Section 6.03(b)(10) <br /> for the injection molding booth and Section(c)(1)for the direct natural gas-fired air make-up unit. Enclosed <br /> 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed <br /> project,including a street address,if any, and section,township, and range, if known. If a proposal would occur over a range of <br /> area,provide the range or boundaries of the site(s). Provide a legal description, site plan,vicinity map,and topographic map,if <br /> reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or <br /> detailed plans submitted with any pernut applications related to this checklist. <br /> 1200 Industry St <br /> Everett,WA 98203 <br /> TO B�COMPLETED BY APPLICAI�T EVALUATION FOR <br /> AGENCY USE ONLY <br /> B. ENVIRONMENTAI.ELEMGNTS <br /> 1. Earth <br /> a. General description of the site(circle one): F1at, olling,hilly,steep slopes,mountainous, <br /> other.. . . .. <br /> 2 <br />