My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 KASCH PARK RD 2018-11-06
>
Address Records
>
KASCH PARK RD
>
2300
>
2300 KASCH PARK RD 2018-11-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 1:59:49 PM
Creation date
5/21/2018 11:25:11 AM
Metadata
Fields
Template:
Address Document
Street Name
KASCH PARK RD
Street Number
2300
Notes
INCLUDES PLAN SETS FOR M1709-043 AND M1801-038
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROVIDE HEAT TRACING ON <br /> ' INTERIOR WALL OF BOX WITH PROVIDE 3-5/8"6 HOLE FOR <br /> ' ' __ 4"VERTICAL SPACING ON VENT AND DISCHARGE PIPE, <br /> I — -------- — <br /> --- — - -------- <br /> , ALL SIDES EXCEPT DDOR FIELD VERIFY LOCATION <br /> PROVIDE ELEPTICAL HOLE FOR <br /> 3"�q 4"IW INLEf PIPE, RELD VERIFY SUPPORT ANGLE WELDED <br /> POC LOCATION AND SIZE TO 80X, ANCHOR BOX TO <br /> q POC � ��2.P�W VISUAL HIGH SUMP ALARM PROVIDE 1"0 HOLE FOR HEAT -� � CONCREfE SLAB (TYP) GEN ERAL N OTES: <br /> _ __ --- - <br /> � INDUSTRIAL WASTEWATER SUMP TRACING PENEfRATION, SEAL ��' \ � <br /> � HEAT TRACING CONTROL �NAST��p A A WITH RUBBER GROMMEf �� � �� STAINLESS STEEL BOX (ALL <br /> 1"OW OIL TRANSFER PROVIDE 1-1/2"0 HOLE FOR ���,i� I SEAMS WELDED WATER-T1GHT) <br /> AND MONffORING PANEL� _____ <br /> PUMP HIGH LEVEL ALARM P-1 <br /> PIPING PUMP POWER CORD AND FLOAT <br /> . T 1 1/2"IW��', 2��W SWITCH CORD PENEfRATION, <br /> pH 2�SS 3"PIW SEAL WITH RUBBER GROMMEf ACCESS DOOR GRIND EDGES TO ROUND <br /> 4" FLUME AND SMOOTH FiNISH (iYP) <br /> FM <br /> SUPPDRi PLAN VIEW <br /> r- -- RACK (TYPj � STAINLESS STEEL ACCESS DOOR <br /> DOOR 28"W x 38'H <br /> LOCKING HANDLE PIANO NINGE <br /> 4"SS <br /> Z�'W ' - - � LOCKABLE 3-WAY � ----� KEY NOTES: <br /> OIL/WATER VAWE, T-PORT I I i PROVIDE STAINLESS STEEL DRAIN PAN BELOW <br /> SEPARATOR O � , � - �CURB 3 4 3, 2„ � -"�I INSL:ATION 2"THICK � SUPERAERATOR XL AS REQUIREC. <br /> � OWS-1 <br /> I � �_r _ ___ _____ _ ___ __ _ ___ __ _ _ __ PAVEMENT 2�COORDINATE LOCATION OF SUPERAERATOR WfTH EXISTING <br /> iYP <br /> 3 � P-2 <br /> SLUDGE � POC � � I I CONDITION. <br /> ` DISCHARGE '--- <br /> CAM-LOK P 3 (E)6"SS �2"PVC TO INDUSTRIAL WPSTEWATER SUMP, SEE FLOW <br /> FfTT1NG If 2�_2��I DIAGRAM ON SHEET M3.0 FOR ADDITIO�AL INFORMATION. <br /> SAMPLER �2,_4., <br /> 4�PROVIDE PIPE HANGER SUPPORT ATTACHED TO CANOPY <br /> `2-B� SQ' STRUCTURE FOR OVERHEAD PIPING. PROVIDE SEISMIC <br /> ELEVATION VIEW BRACING AS REQUIRED (TYP). <br /> SECTION A P � DETAIL p �PUMPE� INDUSTRIAL WASTE (1 1/2" PRIMARY AND 4" <br /> scue vz=ta h42.0 M2.1 sca�e rz°=r-c° M2.0 M2.� SECONDARY CONTAINMENT) TO INDUSTRIAL WASTE <br /> WATER SUMP. <br /> PUMPED INDUSTRIAL WASTE <br /> (1 1/2° PRIMARY AND 4" (E)INDUSTRIAL WASTE <br /> SECONDARY CONTAINMENT) (1 1/2" PRIAIARY AND <br /> (E)INDUSTRIAL WASTE 4" SECONDARY CONTAINh�ENT) <br /> (1 1/2" PRIMARY AND BLDG EXTERIOR WALL TO OWS-1 <br /> (E)1"OW WITH <br /> 4' SECONCARr CONTAINMENT) � SUPERAERATOR XL <br /> TO OWS-1 EXIST REXIBLE HOSE (iYP) 4" SECONDADARY jl MOUNTED ON WALL r <br /> CONTAINMENT � <br /> C I� (E)EBS SUMP PUMP z PUMPED INDUSTRIAL WASTE <br /> M2.1 M2.1 I 3'1�A CONTROL PANEL, ��(1 1/2" PRIMARY AND 4" <br /> /� (E)1 1/2"IW WITH POC 4 RENAME TO INDUSTRIAL SECONDARY CONTAINMENT) <br /> - � � WASTEWATER SUMP PUMP <br /> � Z 4" SECONDADARY CONTROL PANEL <br /> CON?AINMENT = � <br /> P-1 <br /> � 1 1 2"0IW J � ��2��W EN810 AND BUBBLER <br /> i� �- � / _' D FACTORY INSTALLED TUBING, ATTACH TO WALL � <br /> VISUAL HIGH SUMP A�.ARM WffH TUBING CLIPS <br /> ENBIO BIO�OGICAL TREATMENT � INDUSTRIAL WASTEWATER SUMP (FRONT) � OIL TRANSFER PIPING <br /> OWNER fURNISHED �� � PUMP HIGH LEVEL ALaRM P-t (BEHIND) � <br /> SIGNATURE <br /> i I WALL fLOWMETER ROLL-UP DOOR� <br /> i�CHANNEL � I I � ROLL-UP D00� <br /> PIPE PENEfRATION THRU SUPPORT � �r <br /> � SUPPORT (iYP) � I � I WALL WITH ELASTIC WATERPROOF ���W RACK <br /> SUPERAERATOR XL �J i � CEMENT (TYP) � 6"z6"x4" NEMA 3R PULL BOX WITH 2'PVC <br /> , I 1~ r�� i i EXIST FLEXIBLE HOSE (TYP) <br /> �i � INSIDE OF BLDG � Lu OIL/WATER CONDUIT PENEfRATING OUT THE BACK <br /> EXIST INDUSTRIAL WASiE �i i � POC, SEE DWG STi. I SEPAR4TOR TUBING <br /> - (1 1/2" PRIMARY AND 5 i�� �i� ,� ��__� THRU WALL TO INDUSTRIAL WASTEWATER �� <br /> � 4" SECONDARY CONTAINMEN?) � � i� - �F �WS-� SUMP. SEE FLOW DIAGRAM ON SHEET M3.0 <br /> i i 3 p-2 ___ FOR ADDITIONAL INFORMATION <br /> E FROM INDUSTRIAL i i i � r ENBIO BIOLOGICAL TREATMENT <br /> = WASTEWATER SUMP i� ' ��i� I 1 ___ �CURB I OWNER FURNISHED <br /> � i �.� FINISHED FLOOR -1C ---- - „ _ PAVEA�ENT P-� <br /> � <\� // SAWCUT EXISTING PAVE�fENT ' - - L <br /> ' - - —_—` - _- <br /> 9 �i TO ACCOMMODATE NEW - <br /> PIPING. SEE SITE DRAWINGS. SWDGE (E)INDUSTRIAL WASTE <br /> � DISCHARGE <br /> � CAM-LOK �— 5 4, SECO DAIRYCONTAINMENT) <br /> a FfTTING FROM INDUSTRIAL WASTEWATER <br /> � SUMP <br /> � <br /> � <br /> G <br /> � ENLARGED PLAN � SECTION � SECTION � <br /> g SCa�E�. i�2"=�'-0" M2.0 M2.1 SCn�e v2"r-0" M2.�M2.1 SCn�e v2'=r-0" M2.1 M2.1 <br /> - 0 1 2 4 6 <br /> i� SCALE: 1/2"=1'-0" <br /> '. . _. _ _. . _._._ __.. .- - -- . - _. -- - - . _---------- - <br /> a c��''o ��f. ob„�e�. o,t. COMMUNITY TRANSIT °rarNq"°' <br /> �WOO� �°�'�� ` � o � � �'�j�=9� nin c+rT °'"9���Z INDUSTRIAL WASTEWATER PRE—TREATMENT SYSTEMS M2.1 <br /> � ...����, . . . <br /> �Harbin�er�w�"�s`°°°V� ���iuTiui�itjiiiotl5ii �, • �g � � pIU JCI �w r�ai,ni,i KASCH PARK SITE �'�� � � <br /> � <br /> � -�_�= + z> • <br /> m oodna,t�9e,�om ��� �.� '.�"' s <br /> � No. �. R.�.� � �.. . ,�:�:��, �� o a,�:��' E N LA R G E D �I�I N G �U N �\�,T�:; <br />
The URL can be used to link to this page
Your browser does not support the video tag.