My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3603-18
>
Ordinances
>
Ordinance 3603-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 9:15:38 AM
Creation date
5/22/2018 9:15:32 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3603-18
Date
5/9/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. _3603-18 <br /> AN ORDINANCE creating a special improvement project entitled, <br /> "Maple Heights Bridge Seismic Retrofit," Fund 303, Program 113, <br /> to accumulate all costs for the improvement. <br /> WHEREAS, the City of Everett is committed to a comprehensive bridge construction, <br /> maintenance and safety program; and <br /> WHEREAS, the City of Everett has identified the need and obtained funds to construct certain <br /> bridge seismic improvements; and <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: <br /> A special improvement project is hereby established as Fund 303, Program 113, entitled"Maple <br /> Heights Bridge Seismic Retrofit,"to accumulate all costs for the improvement. <br /> Section 2: <br /> Authorization is hereby given to accumulate costs and distribute payments from Fund 303, <br /> Program 113, for the improvement project. <br /> Section 3: <br /> Authorization is hereby granted for the "Public Works Director" or"City Engineer,"under <br /> direction of the Mayor,to assume full and complete responsibility for conducting all tasks and <br /> doing all things to accomplish the actions authorized in this ordinance. <br /> Section 4: <br /> The sum of$1,534,000 is hereby appropriated to Fund 303, Program 113, "Maple Heights <br /> Bridge Seismic Retrofit,"as follows: <br /> A. Estimated Project Costs <br /> Design and Construction $ 1,534,000 <br /> Total Estimated Cost $ 1,534,000 <br /> B. Source of Funds <br /> Bridge Program - Federal Funds $ 1,278,210 <br /> Fund 119- Street Improvements 255,790 <br />
The URL can be used to link to this page
Your browser does not support the video tag.