My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1210 W MARINE VIEW DR 2018-05-22
>
Address Records
>
W MARINE VIEW DR
>
1210
>
1210 W MARINE VIEW DR 2018-05-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 2:38:43 PM
Creation date
5/22/2018 2:38:40 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1210
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_� <br /> PUBL/C WORKS <br /> remarks under each comment are perfectly acceptable). If you need this comment letter <br /> in electronic form, please contact Sabrina �andler at SFandler a,everettwa.gov. <br /> i. 100% Construction Drawings inust have engineer's stamp and signature. See <br /> redlines. <br /> ii. Sheet 5 of 9 add erosion/sedimentation control BMPs as necessary to address the <br /> minimum hazards due to digging up the ground a repaving. At a minimum, add <br /> inlet/catch basin protection to each structure in the area. <br /> iii. On sheet 6 of 9, demolition note 6 shall be revised as redlined. <br /> iv. On sheet 7 of 9, construction notie 5 shall be revised as redlined. <br /> c. If any traftic lanes or sidewalk will need to be closed for the proposed work, please first <br /> coordinate with the City's Traffic Engineering Department by calling 425-257-8810, <br /> press Option 7. Traffic Control Plans may need to be submitted to Traffic Engineering <br /> for review and associated with a Traffic Street Use Permit for temporary lane closure. <br /> 2. The following required site plan corrections have been requested by this project's Planning <br /> Reviewer. If you have any questions regarding these comments, please contact John Jimerson <br /> with the City of Fverett Planning Department (425-257-8737 or JJimerson u,everettwa.�ov). <br /> a. The demo of utilities is good to go forward from a Planning standpoint with no further <br /> action until the Substation proposal. <br /> b. A Special Property Use Permit: Review Process III (Public Hearing rcquired) is required <br /> for the Substation project. Assuming PUD will be the SEPA Lead Agency. For follow- <br /> up, contact John Jimerson. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.