Laserfiche WebLink
• • • <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2,R3,R4 over 3 stories and all R1 Revised August 2016 <br /> Project Info Project Title: Seaway Transit Center Date 12/19/2016 <br /> Compliance Applicantlnformation. Provide contact information for individual v�ho can For Building Department Use <br /> forms do not respond to inquines about compliance form information provided. <br /> require a Company Name: Community Transit/Wood Harbinger <br /> password fo <br /> use. Instructional Company Address: 3009 112th Ave NE, Bellevue,Wa 98004 <br /> and calculating <br /> cellsare v�rite- Applicant Name: Joseph Leysath <br /> protected. <br /> Applicant Phone: 425-628-6065 <br /> Applicant Email: jleysath@woodharbinger.com <br /> Project Description 0 New Building G Addition 0 Alteration 0 Plans Included <br /> lnclude PROJ-SUM form (included in envelope forms v�orkbook) �nith lighting complliance forms. <br /> Building Additions Compliance Method Interior lighting ', Exterior lighting <br /> _ __ _ __ __ _ __r _ __ __. <br /> Lighting systems in addition area comply with all applicable � i � <br /> provisions as a stand alone new construction pro�ect <br /> Refer to Section C502.2.6 for additional -- -- - --- -- - ------ --- --- � - <br /> __. . .. .._...._ <br /> requirements. Lighting systems in addition are combined with existing � 0 i 0 <br /> building lighting systems to demonstrate compliance , <br /> Addition is combined with existing: � � <br /> Forinferior lighting projects, include new+existing intenor lighting fixture v�ettage in Proposed <br /> Lighting Wattage table in LTG-INT-BLD or LTG-INT-SPACE form. <br /> For exterior lighting projects, include new+existing exterior lighting fixture inettage in Proposed <br /> Tradable and Proposed Non-Tradable Lighting Wattage tab/es in LTG-EXT form. <br /> Interior and Exterior Lighting Power ; Interior lighting ! Parking garage Exterior lighting <br /> — - � _. � i _ __ ---- <br /> Lighting Alterations 50%o�n,o�e of eXisci�g a�e�eP�a�ea ' o o ' � <br /> �—_ __--- - <br /> Select all Lighting Poiner and Lighting i <br /> Control e/ements that applyto the scope Less than 50%of existing are replaced p � o 0 <br /> of the retrofit project. If project includes a -��--�-------- --- --- <br /> combination of spaces v�rere less than Lamp and/or ballast replacement only : �� �� <br /> 50%of the existing fixtures are replaced -existing total wattage not increased ; 0 I � � <br /> _ _...-----_ ___ __ _ _______._ ____----_ <br /> in some spaces, and 50%ormore of the 50%or more replaced- Total lightingpovier of new+existing-to-remain fixtures shall comply�ith <br /> fixtures are replaced in others, then total LPA per Sections C405.4.2 and C405.5.2. Include new+existing-to-remain fixtures in <br /> provide separate lighting poiner Proposed Lighting Wattage table in LTG-INT-BLD,LTG-INT-SPACE or LTG-EXT form. <br /> compliance forms for the tuo retrofit Less fhan 50%replaced- Total lighting pov�er of new+existing-to-remain fixtures shall not exceed <br /> conditions.Spaces undergoing the same the total lighting pouter prior to alteration. Include new+existing-to-remain fixtures in the Proposed <br /> type of retrofit may be combined into one Lighting Wattage tab/e in LTG-INT-BLD,LTG-INT-SPACE or LTG-EXT form. <br /> lighting pov�er compliance form. <br /> 50%threshold applies to numberof luminaires for intenorspaces and parking garages, and total <br /> Refer to Section C503.6 for additional installed inettage for extenor luminaires. <br /> requirements. Lighting Controls ' Interior lighting Parking garage Exterior lighting <br /> _ _ __ _ _ � _ _ <br /> All alteration lighting controls shall be New wiring installed to serve added i ' <br /> f�ures and/or fi�ures relocated to : 0 i 0 � <br /> new circuit(s) ; <br /> New or moved lighting panel ' � 0 0 <br /> ____� _------- — -- _ ____�, _ _____m ___. <br /> __---- <br /> Interior space is reconfigured - 0 <br /> luminaires unchanged or relocated <br /> � <br /> _._ __ __ _._ --- — -- . <br /> __--- ---- <br /> Newwiring orcircuit -Forintenorlighting,provide required manual controls perC405.2 3 <br /> occupancy sensor controls per C405.2.1, daylight responsive controls per C405.2.4 and application <br /> p No changes are being made to specific lighting controls per C405.2.5. For extenor lighting,provide required controls per C405.2.7. <br /> the interior or exterior lighting New or moved panel-Provide all applicable lighting controls as noted for New Winng and <br /> sysfems and existing space automatic time s�itch controls per C405.2.2. <br /> uses and configuration are not Reconfigured interior space-Provide all required lighting controls that apply to a new interior <br /> changed. space.Application specific lighting control provisions per C405.2.5 do not apply to reconfigured <br /> Change of Space Use � Existing interior lighting systems in areas under-going a change in space use are upgraded to <br /> comply with LPAs for the new space types per Tables C405.4.2(1)or C405.4.2(2). <br /> Identify intenorspaces requinng LPD upgrade to the current Code in Proposed Lighting Wattage <br /> table in LTG-INT-BLD or LTG-INT-SPACE form. <br /> ' U <br /> f� � ,.� <br />