2015 Washington State En41 ode Compliance Forms for Commercial,R2 and R3 over—ies and all R1-Page 13 of 20 <br /> Energy Recovery(ER)Systems-Service Water Heating and Pool Systems <br /> 0404.10.4 For buildings with pools or permanent spas with water surface area>200 sf,indicate exhaust <br /> (Section Pools and permanent spas air ER method and use of waste heat(preheat ventilation air,pool water or service hot water); <br /> No under exhaust systems or exception taken <br /> 0404.11) (energy recovery) Indicate ER system has the rated effectiveness and is configured to decrease the exhaust air <br /> temperature at design conditions by a 36°F <br /> For buildings with food service,meat or deli departments that have z 500,000 Btu/h of remote <br /> refrigeration capacity for coolers/freezers,indicate if condenser ER will be used to pre-heat <br /> No 0403.5.3 Energy recovery- service water <br /> cooler/freezer condensers For buildings with t 40,000 sf conditioned floor area and with a 1,000,000 Btu/h of remote <br /> refrigeration capacity for coolers/freezers,indicate if condenser ER will be used to pre-heat <br /> service water <br /> For buildings with 24-hour operation and>1,500,000 Btu/h of heat rejection capacity and <br /> No 0403.5.4 Energy recovery- design SWH load>250,000 Btu/h,indicate condenser ER to pre-heat service water;or <br /> condenser systems exception taken.Provide calculations showing the amount of recovered heat that is utilized <br /> (60%of peak heat rejection load or pre-heat service water to 85*F). <br /> No 0404.10 Drain water heat recovery For systems incorporating drain water ER,indicate system design complies with CSA B55.2 <br /> units (or CSA 55.1 for Group R);indicate potable waterside pressure loss at design flow is<10 psi <br /> Service Water Heating Energy Use Metering <br /> No 0404.9 SWH energy usage in For Group R-2 multi-family buildings with central SWH systems,provide metering of hot water <br /> dwelling units energy usage per dwelling unit;indicate metering and data reporting method <br /> SWH equipment energy use For new buildings>50,000 sf and building additions>25,000 sf,with total SWH equipment <br /> No 0409.3.2 metering capacity a 50 kW(z 170,600 Btu/h),verily energy use metering of all SWH equipment will be <br /> provided per C409 <br /> Additional Efficiency Package Option,Reduced Energy Use In Service Water Heating-Must comply with both provisions to be eligible <br /> To comply with additional efficiency package option,verify that z 90%of the conditioned floor <br /> No C406.7.1 Eligible building type area of the building is one or more of the occupancies identified in this section,OR; <br /> Provide whole building energy analysis per C407 that demonstrates the SWH load in the <br /> building is z 10%of total building energy loads <br /> To comply with additional efficiency package option,provide documentation that verifies <br /> >_60%of building annual SWH energy is provided by high efficiency sources(heat pump water <br /> heater with COP s 3,waste heat recovery,solar water-heating system); <br /> No 0406.7.2 Load fraction <br /> C403.5.4 For buildings with 24-hour operation and with>1,500,000 Btu/h of heat rejection capacity and <br /> design service hot water load>250,000 Btu/h(per C403.5.4);provide documentation that <br /> verifies a 100%of building annual SWH energy is provided by condenser energy recovery or <br /> other high efficiency source <br /> Documentation and Specific System Requirements to Supporting Commissioning <br /> Indicate that all SWH equipment and controls for which the WSEC requires control functions <br /> Scope of service water and/or configuration to perform specific functions are required to be commissioned+D7 <br /> No C408.4 heating systems For buildings where the largest SWH system has?200,000 Btu/h total output capacity, <br /> commissioning indicate that all SWH systems regardless of individual capacity are required to be <br /> commissioned. <br /> Indicate that all pool and permanent spa water heating systems regardless of individual <br /> Scope of pool and capacity are required to be commissioned; <br /> No 0408.4.1.3 permanent spa systems Indicate that energy recovery equipment that heats pool water regardless of capacity is <br /> commissioning required to be commissioned; <br /> Identify all pool heating and energy recovery equipment and controls that the WSEC defines <br /> as being capable of and/or configured to perform specific functions. <br /> Indicate in plans and specifications that Cx per C408 is required for all applicable service water <br /> heating systems; <br /> C404.13 Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per 0408.1.2 <br /> C408.1.1 Commissioning including:narrative description of activites,responsibilities of the Cx team,schedule of <br /> No 0408.1.2 requirements in construction activities including verification of project close out documentation per 0103.6,and conflict of <br /> 0408.1.4.2 documents interest plan(if required); <br /> C103.6 Include in general summary that a Cx project report or Compliance Checklist(Figure <br /> C408.1.4.2)shall be completed by the Certified Cx Professional and provided to the owner <br /> prior to the final mechanical inspection. <br /> No 0408.4.1 Functional performance Identifyin plans and specifications the intended operation of all equipment and controls during <br /> testing criteria all modes of operation,including interfacing between new and existing-to-remain systems <br /> Project Close Out Documentation <br /> Documentation and project Indicate in plans that project close out documentation and training of building operations <br /> No 0103.6 close out submittal personnel is required for all SWH components,equipment and systems governed by this code; <br /> requirements indicate close out documentation shall include:record documents,O&M manuals,applicable <br /> WSEC compliance forms and calculations <br />