My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4605 COLLEGE AVE 2018-05-29
>
Address Records
>
COLLEGE AVE
>
4605
>
4605 COLLEGE AVE 2018-05-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2018 10:43:54 AM
Creation date
5/29/2018 10:43:53 AM
Metadata
Fields
Template:
Address Document
Street Name
COLLEGE AVE
Street Number
4605
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/21/2017 MAIL—BIAS COPY <br /> 4677 PUBLIC WORKS DEPARTMENT <br /> Utilities Division,3200 Cedar Street6(� 3 <br /> Everett WA 98201 <br /> 425-257-8800 <br /> COST ESTIMATE SHEET <br /> Receipt # Date Paid <br /> X. Cost of Work Order $1471.00 Work Order# <br /> Cost of Service Order $.00 Service Order# <br /> Contact Person Mike Simmons Telephone# 206 250-8907 <br /> Requested By Jim Spooner , Date of Request 6-21-2017 <br /> Property Owner(name) Mike Simmons <br /> Charge Cost to(name if different than owner) <br /> Address 4605 College Ave City Everett, WA Zip 98203 <br /> Installation Location 4605 College Ave <br /> Installation type/description/size/etc. Tap 3/4" inch on 6 inch C.I.water main and install meter, <br /> setter and box.This is a modification of existing service customer is paying for time and materials <br /> from main to meter only. Meter setter, meter, box and labor to install meter and box will be <br /> charged to meter project. <br /> IT The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $110.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $951.00 Matt Welborn <br /> Randy Allen <br /> Equipment Rental $340.00 Paul McKee <br /> Tax $70.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration - Sabrina Fandler <br /> TOTAL $1471.00 Benyam Stephanos <br /> Prepared by: Jim S o er / Date Estimate Prepared 6/21/2017 <br /> Accepted by: ss� Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2015\4605 College Ave <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.