Laserfiche WebLink
STATEMENT QF SPECIAL INSPECTIONS 2012 IBC SPECIAL INSPECTION REQUIRED BY 2012 IBC <br /> 1. IN ACCORDANCE TO SECTION 1704.2 OF THE 2012 INTERNATIONAL BUILDING CODE <br /> (IBC), THE OWNER IS REQUIRED TO HIRE AN INDEPENDENT INDICATED ITEMS REQUIRING SPECIAL INSPECTION ARE IDENTIFIED UNDER COLUMNS"FREQUENCY OF INSPECTI4N"AS"PERI�DIC'OR : <br /> TESTING/INSPECTION AGENCY TO PERFORM REQUIRED SPECIAL INSPECTIONS. CONTINUOUS". IF NO BOX IS CHECKED, EITHER THE TASK DOES NOT EXIST OR DOES NOT NEED ANY SPECIAL INSPECTION. <br /> 2 THE REQU EM N�TS OF 20112 I C SECTIONS 17�4 AND 1Do ELOW IS FULFILLMENT OF CONCRETE CONSTRUCTI ON I BC 1705.3 & 1705. � 2. � : S01 LS CONSTRUCTION (I BC 1705.6 . <br /> ` 1 \ � <br /> 3. SPECIAL INSPECTIONS AND TESTING WILL BE PERFORMED IN ACCORDANCE WITH THE ITEM FREQUENCY OF INSPECTION INSTRUCTI4NS ITEM FREQUENCY OF INSPECTION INSTRUCTI4NS <br /> APPROVED PLANS AND SPECIFICATIONS, THIS STATEMENT, IBC 2012 CHAPTER 17 AND <br /> AISC 360-10 SECTION "N5". <br /> REINFORCING STEEL CONTINUOUS ❑ PERIODIC � VERIFY PRIOR TO PLACING CONCRETE THAT VERIFY SUBGRADE IS ADEQUATE TO CONTINUOUS � PERIODIC ❑ PRIOR TO PLACEMENT OF CONCRETE. <br /> 4. THE)NSPECT4R SHALL OBSERVE THE WORK FOR COMPLtANCE WITH THE JURISDICTION REINFORCING IS OF SPECIFIED TYPE, GRADE AND ACHIEVE DESIGN BEARING CAPACITY <br /> APPROVED PLANS, SPECIFICATIONS, AND APPLICABLE PROVISIONS OF THE IBC, THE SIZE; THAT IT IS FREE OF OIL, DIRT AND RUST;THAT IT <br /> ARCHITECTS/ENGINEER'S REVIEWED SHOP DRAWINGS,AND/OR PLACEMENT DRAWINGS, IS LOCATED AND SPACED PROPERLY;THAT HOOKS, <br /> MAY BE USED ONLY AS AN AID TO INSPECTIONS. BEND, TIES, STIRRUPS AND SUPPLEMENTAL VERIFY EXCAVATIONS EXTEND TO CONTINUOUS ❑ PERIODIC � PRIOR TO PLACEMENT OF COMPACTED FILL <br /> a. CONTINUOUS SPECIAL INSPECTION -THE FULL-TIME OBSERVATION OF WORK REINFORCEMENT ARE PLACED CORRECTLY;THAT LAP PROPER DEPTH AND MATERIAL OR CONCRETE. <br /> REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WH� IS LENGTHS, STAGGER AND OFFSETS ARE PROVIDED; <br /> PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED. AND THAT ALL MECHANICAL CONNEGTIONS ARE VERIFY THAT SUBGRADE HAS BEEN CONTINUOUS � PERIODIC ❑ PRIOR TO PLACEMENT 4F COMPACTED FILL. <br /> INSTALLED PER THE MANUFACTURER'S INSTRUCTIONS APPROPRIATELY PREPARED PRIOR TO <br /> b. PERIODIC SPECIAL INSPECTION -THE PART-TIME 4R INTERMITf'ENT AND/OR EVALUATION REPORT. PLACING COMPACTED FILL <br /> OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BYAN APPROVED <br /> SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORM CLASSIFICATION ANQ CONTINUOUS � PERIODIC ❑ ALL MATERIALS SHALL BE CHECKED AT <br /> PERFORMED AND AT THE COMPLETION OF THE W4RK. <br /> CAST-IN BOLTS &EMBEDS CONTINUOUS � PERIODIC ❑ INSPECTION OF ANCHORS OR EMBEDS CAST fN TESTING OF COMPACTED FILL EACH LIFT FOR PROPER CLASSIFICATIONS <br /> 5. THE SPECIAL INSPECTOR SHALL COMPLETE A DAILY REPORT FOR EACH DAYS CONCRETE IS REQUIRED WHEN ALLOWABLE MATERIALS AND GRADATIONS NOT LESS THAN ONCE <br /> INSPECTIONS. THE DAILY REPORTS SHALL REMAIN AT THE JOB SITE WITH THE LOADS HAVE BEEN INCREASED OR WHERE FOR EACH 10,OOOFT 2� OF SURFACE AREA. <br /> CONTRACTOR FOR THE BUILDING DIVISION'S INSPECTOR.THE REPORTS SHALL STRENGTH DESIGN IS USED. <br /> INCLUDE THE FOLL�WING. <br /> a, NAME OF SPECIAL INSPECTOR AND DATE THE INSPECTI4N WAS PERFORMED. VERIFY PROPER MATERIALS, CONTINUOUS � PERIODIC ❑ <br /> POST-INSTALLED ANCHORS OR CONTINUOUS � PERIODIC ❑ ALL P4ST-INSTALLED ANCHORS/DOWELS SHALL DENSITIES AND LIFT THICKNESSES <br /> b. DESCRIPTION OF THE INSPECTIONS, WITH LOCATIONS AND TESTS PERFORMED. DOWELS BE SPECIALLY INSPECTED AS REQUIRED BY THE DURING PLACEMENT AND <br /> APPROVED ICC-ES REPORT. COMPACTION <br /> c. LISTING ANY N4N-CONF4RMING ITEMS. <br /> d. INCLUDE HOW ITEMS WERE RESOLVED OR UNRESOLVED. USE OF REQUIRED MiX DESIGN CONTINUOUS � PERIODIC ❑ VERIFY THAT ALL MIXES USED COMPLY WITH THE <br /> e. LIST ANY CHANGES OR CORRECTIONS TO NON-CONFORMING ISSUES AUTHORIZED APPROVED CONSTRUCTION DOCUMENTS;ACI <br /> BY THE ENGINEER, ARCHITECT, OR BUILDING DIVISION'S INSPECTORS. 318;CH 4, 5.2-5.4;AND IBC 19004.3, 19.13.2, 1913.3. <br /> 6. THE INSPECTOR SHALL BRING NON-CONFORMING ITEMS TO THE IMMEDIATE ATTENTION OF <br /> THE CONTRACTOR, AND NOTE ALL SUCH ITEMS IN THE DAILY REPORT. IF ANY ITEM IS NOT <br /> RESOLVED IN A TIMELY MANNER AND IS ABOUT TO BE INCORPORATED IN THE WORK,THE CONCRETE SAMPLING FOR STRENGTH CONTINU4US � PERIODIC ❑ <br /> SPECIAL INSPECT4RS SHALL IMMEDIATELY NQTIFY THE OWNER AND THE ENGINEER OF RECORD, TESTS, SLUMP,AIR CONTENT,AND <br /> TEMPERATURE <br /> 7. THE INSPECTION AGENCY SHALL FURNISH MONTHLY REPORTS OF THE TEST AND <br /> INSPECTIONS PERFORMED DIRECTLY TO THE BUILDING DIVISf�N, ENGINEER OF RECORD, CONCRETE PLACEMENT CONTINUOUS ❑ PERIODIC � <br /> AND/OR OTHERS AS DESIGNATED. <br /> 8. THE INSPECTION AGENCY SHALL SUBMIT A FINAL SIGNED AND SEALED REPORT TO THE <br /> BUILDING DIVISION STATING THAT ALL ITEMS REQUIRING SPECIAL INSPECTIDNS AND TESTING CURING TEMPERATURE AND CONTINUOUS � PERIODIC ❑ VERIFY THAT THE AMBIENT TEMPERATURE F4R <br /> WERE FULFILLED, ALL DISCREPANCIES WERE CORRECTED OR RESOLVED,AND ALL WORK TECHNIQUES CONCRETE IS KEPT AT > 50°F FOR AT LEAST 7 <br /> REQUIRING SPECIAL INSPECTIONS IS IN CONFORMANCE WITH THE APPROVED DESIGN DAYS AFTER PLACEMENT. HIGH-EARLY- <br /> DRAWINGS AND SPECIFICATIONS AND APPLICABLE CODES.ANY ITEMS UNRESOLVED OR STRENGTH CONCRETE SHALL BE KEPT AT>50°F <br /> DISCREPANCIES IN COVERAGE (I.E. MISSED INSPECTIONS, PERIODIC INSPECTIONS WHEN F�R AT LEAST 3 DAYS. ACCELERATED CURING <br /> CONTINUOUS WAS REQUIRED, ETC) SHALL BE SPECIFICALLY ITEMIZED IN THE REPORT. METH�DS MAY BE USED (SEE ACI 318:5.11.3).THE <br /> AMBIENT TEMPERATURE FOR SHOTCRETE SHALL BE <br /> 9. THE STATEMENT OF SPECIAL INSPECTION HAS BEEN PREPARED BY THE ENGINEER >40°F FOR THE SAME PERIOD OF TIME AS NOTED FOR <br /> OF RECORD WITH THE UNDERSTANDING THAT THE BUILDING OFFICIALS WILL: CONCRETE. SHOTCRETE SHALL BE �. <br /> KEPT CONTINUOUSLY MOIST FOR AT LEAST 24 <br /> a. REVIEW AND APPROVE THE QUALIFICATIONS OF THE SPECIAL INSPECTORS WHO HOURS AFTER SHOTCRETING.ALL CQNCRETE N EW S H E� AD D ED <br /> WILL PERF�RM THE INSPECTIONS. MATERIALS, REWFORCEMENT, FORMS, FILLERS, <br /> AND GROUND SHALL BE FREE FROM FROST. IN <br /> b. MONIT4R SPECIAL INSPECTION ACTIVITIES ON THE JOB SITE TO ASSURE THAT HOT WEATHER CONDITIONS ENSURE THAT <br /> THE SPECIAL INSPECTORS ARE QUALIFIED AND PERFORMING THEIR DUTIES AS APPR4PRIATE MEASURES ARE TAKEN TO AVOID O <br /> CALLED FOR IN THE STATEMENT OF SPECIAL INSPECTION. PLASTIC SHRINKAGE CRACKING AND THAT THE <br /> SPECIFIED WATER/CEMENT RATIO IS NOT <br /> c. REVIEW SUBMITTED INSPECTION REPORTS. EXCEEDED. <br /> d. PERFORM INSPECTIONS AS REQUIRED BY THE LOCAL BUILDING CODE. <br /> ERECTION QF PRECAST CONCRETE CONTINUOUS ❑ PERIODIC � VERIFY THAT ALL PRECAST ELEMENTS ARE LIFTED, <br /> e. WILL ISSUE CERTIFICATION OF OCCUPANCY AFTER ALL SPECIAL INSPECTION ASSEMBLED AND BRACED IN ACCORDANCE WITH <br /> REPORTS AND THE FINAL SPECIAL INSPECTION REPORT HAVE BEEN SUBMITTED THE APPROVED CONSTRUCTION DOCUMENTS. <br /> AND ACCEPTED. <br /> FORMW4RK CONTINUOUS ❑ PERIODIC ❑ VERIFY THAT THE FORMS ARE PLACED PLUMB <br /> AND CONFORM TO THE SHAPES,LINES,AND <br /> DIMENSIONS OF THE MEMBERS AS REQUIRED BY <br /> THE APPROVED CONSTRUCTION DOCUMENTS. <br /> �S A . <br /> ,`�,� oF wASy��F <br /> F <br /> . . . � Thom A.L ~�� � � ��Z � <br /> www.br h.com o �o:5s -oa-2o� - M <br /> P Copyright 2015 � <br /> Architects, Engineers, Constructors L,� �p 2� � <br /> � <br /> 19020 33rd Ave W,Suite 530 Washington Office Fs F��S T E�� ��� <br /> Lynnwood,Washington,98036 S�0 N p L �N <br /> 425-921-3500 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBO� DATE <br /> oF wASH� ACCEPTABILITY JKN 04 08 16 STATEMENT OF SPECIAL INSPECTIONS / / <br /> ,�P�� N�ro THIS DESIGN AND/OR CHECKED � 6� � O O4 OH � 6 <br /> 0 ISSUE FOR CONSTRUCTION (FOUNDATION SYSTEM) JKN GGH 04/08/16 � y SPECIFICATION IS APPROVED GGH 04 08 16 SHEET <br /> �0�,��c� BRP"^R�"���TS ; rir�E�l- _ 40-23 747 TURN FIXTURE RELOCATION FOUNDATION SYSTEM � � � <br /> eNciNe�stNc ; APPROVED BY DEPT. DATE TAL 04 08 16 � 0 nn <br /> , NO3t3� ; � CHECKED V V <br /> � � � � � � � � � BUILDING40 023 <br /> ��'� o A PROVED � JOB No.WO 15/2899—1001 COMP N0. <br /> /FicqTF OF AUtH����P�\ APP VED DWG N0. <br /> STRUCTURAL MASTER EVERETT, WA 40-023—S2o-1001 <br />