Laserfiche WebLink
INSPECTION REPORT <br /> cN. <br /> Nil Date Permit: 6\1V� 6�v <br /> A,,,., .. <br /> Contractor: 1)O a\Rdr_ Ct{. <br /> ecil <br /> Owner: atenrii- WIORA <br /> Site Address: 5 -0c • I , . ._ .. <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> IS Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> S w.roundwork ❑Footing ❑Rough In ❑Rough In <br /> '%'- .b/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> V Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding LI Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> O ER OR CONSULTATION: yZS <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> .1t( <br /> FOR T.C.O. ❑ CORRECTILATION IOON REQUESTED El❑ OK FOR C.O. ❑ VIO <br /> ❑ UNABLE TO PERFORM INSPECTN: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 6Lf - eCUL? •-)()?`-iC-------- <br /> • <br /> 7 g> {Inspector: - Ad Date: <br /> EIR(10/06) IATABAR,INC. <br />