Laserfiche WebLink
�9/2 17 <br /> PUBLIC IAIORKS PERMIT Date: 4 <br /> \ __ City of Everett Public Works Department Public Works Permit#: PW1704-037 <br /> �. 3200 Cedar Street Parent Permit#: <br /> Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 1,040.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> JSH PROPERTIES PACIFIC PAVEMENTPROTECTION(P3) <br /> 10655 NE 4TH ST. SUITE 901 19827 23RD DR SE <br /> BELLEVUE WA 98004 BOTHELL WA 9801a <br /> PHONE: 4256790525 PHONE: 2067608600 <br /> TAX PARCEL ID# 28050600100200 SITE ADDRESS: 5209 EVERGREEN WAY <br /> GRIND &OVERLAY RE-PAVING OF EXISITNG PARKING LOT <br /> PARKING LOT TO BE RE-STRIPED TO MEET CITY OF EVERETT STANDARDS. <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 — —I ; <br /> 4. Site Civil Work to be done per plans approved (as noted) by the City of Everett Public ..,....,.• ,-_.,-• T ; co <br /> Works Department dated 4/25/2017. c=1 2.-.,,_, ,,,, , --+ <br /> 5. Refer to attached standards for required parking stall geometry. • <-- -a E P w <br /> 6. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 pr T ; ' !:; En* <br /> to starting construction and with other inspection requests. c.; H <br /> 7. Any field changes to stall/aisle width geometry shall be coordinated with and <br /> approved by the Public Works Inspector in the field. 6 F:)r-a• <br /> 8. This permit scope covers parking lot maintenance only, meaning that grind and , <br /> overlay shall not touch or disturb the subgrade/base course. If 2000sf or more of asphalt 0 a <br /> is removed to the base course, drainage mitigation will be triggered and a report and it t...g .., <br /> plan will have to be turned in to comply with the 2010 Stormwater Managment Manual. ;n• F . . ` Z <br /> 9. Install erosion control measures per City of Everett Standards for small parcels ands-.L ii P P°P 8;;'.."':':r. <br /> 5:2- 0remove upon completion of the project prior to final approval of the permit. °' a 8`-,4 gE °1 <br /> c..; <br /> 10. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto —"—"``'' iii <br /> roadway. c• <br /> CA <br /> 11. Protect all existing underground utilities during construction. - <br /> Public Works Permit Fee Breakdown: <br /> Paving(-200,000SF) $1,000.00 4.4 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> 7 - City of Everett from any and all claims for damages,costs,expenses,or <br /> A , `<` �Lr�sr�l� 4,-- 25-....�' 7 causes of action that may arise because of installation and maintenance of the <br /> A roved for Construction Date / improvement or other right-of-way use hereto applied for and further agrees to <br /> p remove same upon not e from e City and to replace public property <br /> dam hereby <br /> FINAL INSPECTION Date •tel C//.�7-/7 <br /> Approved as Constructed Si ture of App!cant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AN THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORKONTHIS PROJECT OVER 90 DAYS DURATION. <br /> !/ VL <br />