Laserfiche WebLink
i , <br /> OMEGA. 2707 Wetmore Avenue <br /> Everett, WA 98201 <br /> ENGINEERING, INC. t 425.387.3820 <br /> f 425.259.1958 <br /> October 24, 2016 APPROVED <br /> PUBLIp WORKSe_-�ADEPART ENT <br /> City , InJh� <br /> of Everett BY <br /> 3000 Cedar Ave DATE I/—lb- <br /> Everett, WA 98201 CITY OF EVERETT REVIEWED FOR PERMIT <br /> pw16/l-oa7 <br /> RE: Robinett Short Plat— 8" HDPE As-Built Conveyance Calculations <br /> Dear Staff, <br /> • This letter is being prepared to define the change in the conveyance capacity for the 8" HPDE pipe that <br /> was installed as part of the Robinett Short Plat. The 8" HDPE system collects runoff from the two short <br /> plat lots along with two other existing lots, one of which has recently applied for a building permit with <br /> the City. <br /> Project As-Builts. <br /> The proposed 8" HDPE pipe from CB #2 to the bluff was designed with a slope of 1.3%. The as-built <br /> slope of that same pipe was found to be 2.9% by ASPI the project surveyor. As a result the <br /> conveyance capacity for the as-built pipe will be greater than the original design capacity. <br /> The following is an excerpt from the approved drainage report Section 9: <br /> The peak Q for the 100-year event was calculated to be 2.16 cfs. Using Manning's equation an <br /> 8"pipe with a minimum slope of 1.32% has the capacity to convey that runoff without any <br /> backwater-conditions. Therefore, the pipe system north of CB#2 will be 8"HDPE pipe to the <br /> • bottom of the slope with diffuser tee for energy dissipation. <br /> Using the same approach, the peak capacity of the as-built 8" HDPE can be calculated to determine the <br /> addition flow capacity in the steeper pipe (s=2.9%). The new peak capacity for this system is 2.98 cfs. <br /> Refer to the attached Manning's Equation spreadsheet. The rational method calculation for the <br /> maximum impervious areas allowed to be tributary to this system can be increased. The attached <br /> rational method calculation sheet shows that the maximum impervious area can be increased to 0.97 <br /> ac. <br /> As noted above the existing SFR parcel directly to the west of the short plat has already had a building <br /> permit with drainage plan/report submitted to the City. This project proposed to construct 0.20 acres of <br /> impervious surfaces to be tributary to the 8" HDPE pipe. As a result that leaves 0.77 impervious acres <br /> ofcapacity for this system.- Lot 2 of this short plat has submitted building permit with site plan showing <br /> that 0.19 acres of impervious surfaces will be directed to the 8" pipe. <br /> Therefore, at this time there remains 0.57 impervious acres (25,000 sf) of capacity in the as-built 8" <br /> HDPE pipe system constructed for this project to serve the SP Lot 1 and the existing adjacent parcel <br /> west of Lot 1. This available capacity is expected to be more than enough since the longer driveways <br />