Laserfiche WebLink
, INSPECTION REPORT <br /> Date foli 1 a19' Permit: 10'B--O'" l <br /> .„..- `5,amvi`-e,(A) ajui-, 11)15 <br /> Contractor: <br /> )4(rOwner: DA) '- <br /> Site Address: - I,o \ �� 7'I V ei <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> Temp Service ❑UFER ground - ❑Groundwork/Slab ❑Groundwork/Slab <br /> ▪Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ▪Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate 0O to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> p r <br /> w i+1,11-,„ 5.— 4F psJ-U`DU/ Lc"?i <br /> Inspector: `�i Date: . , f'411_02, <br /> EIR(10/06) DATABAR,INC. <br />