Laserfiche WebLink
INSPECTION REPORT <br /> /Nlidgiff <br /> ,44, 1- Date sl /�� Permit: __� 71720—D`/T, <br /> d <br /> Contractor: • I ILL' /MP/6Ve` <br /> Owner: _FAZIO <br /> Site Address:_La/ /14CMean Ate, <br /> YPE OF I N PECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service r e ER • . ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Buildin 'nal ❑Gas Pipe Final ❑HWT Final <br /> �/ <br /> 0 ER OR CONSULTATION: E <br /> 0•t,,4_4-PROVAL ❑ PARTIAL APP VAL FINAL APPROVAL THIS PERMI <br /> N •K FOR T.C.O. ❑ CORRECTIO REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: ____ ?___ <br /> EIR(10/06) DATABAR,INC. <br />