Laserfiche WebLink
-- INSPECTION REPORT <br /> 17 Date Sikh Pe mit: et-70 7-v 7,--V. <br /> Contractor: eV,977,V7 <br /> Owner: i�� - - --- - <br /> Site Address: 7 d ZSR ''' i � 7._ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains )2tuilding Final ❑Gas Pipe Final <br /> ❑HWT Final <br /> _ <br /> OTHER OR CONSULTATION: V C_. /` (,[�S—' In77 ' <br /> c <br /> ❑ APPROVAL ❑ PARTIA ROYAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. RECTION REQUESTED El <br /> • OK FOR C.O. ❑ VIOLATION <br /> 25RF8O81RFMOINSPECTION:111 UNLL(425) TION <br /> —24 hour notice required <br /> 7�% § . i i I FL-% ref of <br /> ' /a)7 7�/ `��- ' 4) <br /> 4,-,e. <br /> 1 se--- ()al et - Pte- t eo <br /> b F.: <br /> Inspector: Date: A943) <br /> 3) <br /> EIR(10/06) - DATABAR,INC. <br />