Laserfiche WebLink
EGN NO./ <br /> PAGE 2 OF 13 <br /> ARSENE PROFESSIONAL ENGINEERS INC. <br /> CALCULATION SHEET <br /> Project 164AEC4005 Site Location CASCADE HIGH SCHOOL N.WATER TANK <br /> Subject STRUCTURAL ASSESSMENT OF T-MOBILE SITE SE01845A Sheet of <br /> REV ORIGINATOR DATE REVIEWER DATE REV ORIGINATOR DATE I REVIEWER I DATE <br /> 0 F.ARSENE 05/11/2016 <br /> 1 PROJECT SCOPE <br /> The scope of this structural design report, is as follows: <br /> • Install (3) new antennas (NOKIA FASB)(1 per sector) <br /> • Install (3) new FRIJ (inside antenna)(1 per sector) <br /> • Install (3) new FHFB (inside antenna)(1 per sector) <br /> • Install (3) new antenna mounting (1 per sector) <br /> • Install (3) new FRBG on tower <br /> • Install (3) new FSMF on rack <br /> • Install (2) new FBBC on rack <br /> • Install (2) new equipment racks <br /> • Install (2) new COVP (1 on tower, 1 on ground) <br /> • Install (1) new 8'x8' equipment shelter <br /> 2 SITE CONFIGURATION <br /> The new proposed equipment will be installed on new antenna mounts on a 83 ft tall water <br /> tower and inside the equipment cabinets at the water tower base.. <br /> ARSENE PROFESSIONAL ENGINEERS INC (CALCULATION SHEET 06/2012) <br />