Laserfiche WebLink
11 11' 12 13 �EGEN� <br /> '-031 " 100'-0" 100'-0° <br /> '-0" 41'-4° g�_$�� �-0° 24'-4° 6'-0" 20'-8�� �_p�� <br /> I S282 I o I <br /> — �RE s�M _ Match Line See Sht 40-035-TNS10-16 3 N <br /> – – – – – – � i — — ` --A � — – – – <br /> i /�on s283 � ' � _ -a— L.7 <br /> SLOL 8 � _� . , .. 4 .. " :f� , ' . �q � 4. • ' ' - I - ` - �a,_A_ <br /> I ' ' - `� _...�. ' _�a�_ ' � . I <br /> a� � � � . � . . . <br /> � <br /> ; :" 1 <br /> I d M <br /> I I Q' < I <br /> E �� � <br /> =°s282 - <br /> � I <br /> , _ _ , 4 �. - , GENERAL NOTES <br /> a' � TYP - - � EXISTING UTILITY TUNNEL(TYP) <br /> d <br /> - A - -_ <br /> � M 4 S281 � - � EXISTING PEDESTRIAN TUNNEL(TYP) <br /> I � - � � � <br /> ( <br /> � I ' . �4 . I . . <br /> I I I <br /> _ _ <br /> � <br /> � <br /> � <br /> _ � <br /> I A ° <br /> I � °� I - I <br /> � ; <br /> a a <br /> o A � 4 � ( <br /> � 2 � - S282 N <br /> ' . a ' �° �� - 2�_o��X2�.o��TRENCH � I o CONSTRUCTION NOTES <br /> , - , <br /> (NOT IN W0/800 <br /> CONTRACT) Z <br /> � �� � <br /> � 4 �� � 1� 2'-0"x 2'-0"UTILITY TRENCH(TYP) <br /> � OPP I 4. � M <br /> B HAND O 2�, 4'-0"x 5'-0"UTILITY TRENCH(TYP) <br /> 0 <br /> � s2s2 OPP = <br /> �P I � o � EXTENT OF PHASE 1 CONSTRUCTION OCCURS TO THE SOUTH OF THIS <br /> I HANp n � — ( � LOCATION. CONTRACTOR TO DESIGN AND UTiLIZE VERTICAL STEEL <br /> �o PLATE TO TEMPORARILY SHORE SOIL UNTIL PHASE 2 CONSTRUCTION, <br /> �"� � �� _� � TO THE NORTH OF THIS LOCATION,CAN PROCEED. CONTRAGTOR TO <br /> SZ82 _ _ � UTILIZE FORM-SAVERS FOR HORIZONTAL REINFORCING IN SLAB AND <br /> -, � � WALLS OF THIS TUNNEL AS REQUIRED. <br /> � � - � � <br /> � °O 0O = <br /> '9 <br /> I I I � <br /> — —_ � � <br /> �I/ <br /> � � � O <br /> I � 4'-0" 4'-0° I � ti W <br /> F— — — � - —r—� �— �— � <br /> REFERENCE DRAWINGS <br /> TYP <br /> I <br /> I I � I <br /> s2s2 <br /> I I I � � <br /> 0 ' <br /> I <br /> I � � <br /> i <br /> I I � I <br /> �� ��, BLDG 40-034 <br /> — 12 13 14 15 16 ll <br /> I K � K <br /> �' L _10— � 11 �— L �' <br /> � � ( <br /> 13 � 14 � <br /> � � <br /> L8 � � � L3 <br /> � BLDG I I <br /> � 40•025 16 � 17 � <br /> _ _ - - _ _ _ _ _ _ _ _ _ � l _ _ _ � _ _ _ _ _ _ _ �.� ,� �.� <br /> Ti� �T-T � �-.—_—? �=�T— — M �`!` <br /> � Match Line See Sht 40-035-TNS10-22 '� � <br /> _ _ _ _ M 4 �� // ZO M <br /> � � I <br /> 22 23 <br /> Nii 11' 12 13 14 18 i6 17 N <br /> BLDG 40-036 <br /> BUILDING 40-035 KEY PLAN A' <br /> NTS 'V <br /> PARTIAL TUNNEL PLAN o 4� $� 16� �4� <br /> SCALE: 118"=1'-0" ' `� <br /> SCALE: 118"= 1'-0" <br /> www.brph.com Copyrighto2016 <br /> Architects, Engineers, Constructors <br /> This item has been electronicalty signed and sealed 6y Thomas Lee,PE using a digitai 19020 33rd Ave W,Suite 530 State of Washington <br /> signature and data. Lynnwood,Washington,98036 Certificate of Authorization <br /> Printed copies of this document are not considered signed and sealed and the signature must 425-921-3500 Architecture No.603235512 � <br /> Engineering No.3137 � <br /> be venfied on an electronic c ies n <br /> DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE a <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE c <br /> MPS A. ACCEPTABIL(TY BEL o��27�,6 TUNNEL PLAN <br /> 0 RELEASE 8- IFC WING BODY JOIN WBS16321 25-35) BEL TAL O7/27(16 ,��� oF WASN��F� THIS DESIGN AND/OR CHECKED �632� 07/27/16 � <br /> � } � �� s �'c SPECIFICATION IS APPROVED HM 07/27l16 SHEET � <br /> BOE,�� � 1 as� r 07� �� T� ENGINEER TITLE FACTORY TRANSFORMATION 777X WING BODY JOW � <br /> � � ' APPROVED BY DEPT. DATE AL O7l27/16 � <br /> CHECKED T N S 1 0-19 -800 � <br /> 0 254�1 � APPROVED B U I LD I N G 40 035 ,lpg NO. COMP NO. r <br /> FSSFc�NSA i��°��� W015/2$99-800 � <br /> APPROVED STRUCTURAL MASTER COL L.7-M/11-13 EVERETT,WA ow�No. 40-035-TNS10-19-800 <br />