GE�IERAL �IOTES <br /> 0 1 . CONTRACTOR TO COORDINATE ALL DEMOLITION WITH <br /> OWNER PRIOR TO BEGINNING WORK. COORDINATE <br /> 1 �- DEMOLITION WITH OWNERS TOOL USAGE PLAN TO <br /> ENSURE EQUIPMENT REMAINS OPERATIONAL FOR THE <br /> DURATION OF ITS PLANNED USAGE. COORDINATE WITH <br /> A/E FOR ALL TEMPORARY POWER NEEDED TO KEEP <br /> EQUIPMENT FUNCTIONAL. <br /> I I I 2. COORDINATE DISPOSAL, SALVAGE AND RECYCLING OF <br /> ALL DEMOLISHED/REMOVED MATERIALS WITH BOEING. <br /> ti <br /> - — - - - - - -- - - -- - � <br /> � <br /> � MATCHLINE - FOR CONTINUATION SEE SHEET 1E14__ __ � __ __ __ __ __ � o CONSTRUCTION NOTES <br /> � � DEMOLISH ALL ELECTRICAL WORK IN AREA BACK TO <br /> SOURCE, COORDINATE REMOVAL WITH OWNER PRIOR <br /> � TO BEGWNING WORK. <br /> � I I <br /> I <br /> I <br /> I <br /> I <br /> I I � <br /> I <br /> I <br /> I I � <br /> I <br /> I <br /> I <br /> I � I � <br /> I <br /> I <br /> � I � � <br /> i � <br /> i <br /> —_-_ ,� a _ -- -- - =— =-, ,i -_— =—._— _ __ —_ ___— --_— —_— — � �— <br />