Laserfiche WebLink
- GENERAL f� OTES <br /> 0 <br /> 13 13.5 14 1 . CONTRACTOR TO COORDINATE ALL DEMOLITION WITH OWNER <br /> PRIOR TO BEGINNING WORK. COORDINATE DEMOLITION WITH <br /> OWNERS TOOL USAGE PLAN TO ENSURE EQUIPMENT REMAINS <br /> OPERATIONAL FOR THE DURATION OF ITS PLANNED USAGE. <br /> COORDINATE WITH A/E FOR ALL TEMPORARY POWER NEEDED TO <br /> � I � KEEP EQUIPMENT FUNCTIONAL. <br /> 2. COORDINATE DISPOSAL, SALVAGE AND RECYCLING OF ALL <br /> DEMOLISHED/REMOVED MATERIALS WITH BOEING. <br /> — I — — — — — — — — — L.� <br /> i <br /> MATCH LINE �` <br /> . ��� a������������r����������������i���������1� <br /> SEE SHT. TNE117* <br /> � O <br /> � CONSTRUCTI0 �1 f� OTES <br /> W�� <br /> z� <br /> � � <br /> � DISCONNECT AND REMOVE ALL ELECTRICAL DEVICES, <br /> _ <br /> � "' EQUIPMENT, CONDUCTORS, AND CONDUIT IN HATCHED <br /> � � N I I AREA BACK TO SOURCE, UNLESS NOTED OTHERWISE. <br /> i <br /> I <br /> 1 <br /> I � � <br /> I <br /> I <br /> I <br /> PHASE 2 <br /> � � , <br /> � <br /> � � <br /> � <br /> � <br /> � <br /> � � <br /> I I I 1 I <br /> �� . <br /> / ' <br /> I �__ <br /> � , <br /> � <br /> L-- <br /> BUSWAY 4V35-2M12.5-14 <br /> � A 400A, 480V, 3�, 3W, GND <br /> � "GE SPECTRA SERIES" F3GC01SD" � <br /> TNE120 TNE509 >> i� �z 13 �4 15 i s �� <br /> BLDG 40-34 <br /> � i I � K K , <br /> , <br /> �� ��� <br /> L <br /> � 13 114 <br /> N L.3 <br /> I � 16 117 . <br /> ( L.7 <br /> C� <br /> � � I � �9 �� <br /> m M <br /> � � <br /> I N ` <br /> � BLDG 40-36 � DENOTES PLANS <br /> KEY PLAN NOT INCLUDED W <br /> MATCH LINE THIS SET <br /> -- --------------�----------------------- SCALE: NONE <br /> SEE SHT. TNE123* <br /> I � � � . <br /> — — — — — — — — — — M 4' 2' 0 4' 8' 12' 16' 20' <br /> . �: <br /> PARTIAL TU N N EL LEVEL 480Y 277V POWER PLAN <br /> SCALE: 1/8"=1 '-0" N www.brph.�om Copyrighto 2016 <br /> Architects, Engineers, Constructors � <br /> 19020 33rd Ave W,Suite 530 State of Washington <br /> Lynnwood,Washington,98036 Certificate of Authorization <br /> 425-921-3500 Architecture No.603235512 <br /> Enginaering No.3137 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DAT SUBTITLE CURRENT REVISION SYMBOL DATE <br /> 0 Release 8 — IFC Wing Body Join — WBS16321)(25-35) VTB DFC 07/27/16 ��' �A�A6 HSC ESGN BND/R HECKED �� 27 16 16321 O 07 27 16 . <br /> c REMOVAL PARTIAL TUNNEL LEVEL 480Y/277V POWER PLAN / / <br /> q�y,�w°F WAS'�I�T�1,� SPECIFICATION IS APPROVED SMS 07 27 16 sHE�r <br /> �oE,��� °z s Me z�P � APPROVED BY DEPT. DATE g�g 07 27 16 r�r�E FACTORY TRANSFORMATION 777X Wing Body Join <br /> A � ,. � CHECKE� <br /> TN E 120 R -8�0 -� <br /> � �� w B U I LD I N G 44-035 JOB N0. COMP N0. <br /> o� `�Fc�sTER�° ti� APPROVED <br /> �sSIONAL �� <br /> WO 15/2899 - 800 <br /> a,PPR vEo ELECTRICAL MASTER COL L.7-M/13-14 EVERETT, �li/q °wc rvo. 40-35-TNE120R-800 � <br />