Laserfiche WebLink
Subproject#7 Mass Search and Rescue Operations—City of Everett Fire Dept <br /> The goal of this subproject is to improve the Region's ability to conduct mass search and rescue operations. The link <br /> to the approved project in the 16SHSP Investment Justification is --8) Mass Search & Rescue Operations; specifically, <br /> upgrade search and rescue equipment, including trench rescue shoring equipment and training, and replace existing <br /> SAR aviation fuel truck. (Note: The Region has determined the fuel truck fits better with Subproject#8.) Gaps exist in <br /> having specialized search and rescue equipment and training associated with use of new specialized equipment. The <br /> focus area during this funding cycle is to provide training for the technical rescue team. Funding will be used to <br /> conduct specialized training for the rescue team. Additionally, funds will be used for the purchase of one INMAR 430- <br /> SR-14" Inflatable Search & Rescue Boat with SCUBA adapter air fill kit, large transom scuppers, and a Suzuki <br /> DF25AS2 outboard motor. <br /> The desired outcome is that the Region will be better able to effectively and efficiently complete search and rescue <br /> operations. <br /> Subproject#8 On-Scene Security, Protection, and Law Enforcement <br /> The goal of this subproject is to maintain the core capability of Security, Protection and Law Enforcement. The link to <br /> the approved project in the 16SHSP Investment Justification is—9) On scene Security, Protection, and Law <br /> Enforcement-maintain current responder readiness capability. Gaps exist with law enforcement equipment due to <br /> aging and with First Responder simulcast communications in rural and mountainous areas. The current fuel truck for <br /> the Snohomish County Sheriff's Office helicopter is old and in poor condition, continued repairs are not cost effective. <br /> The vehicle needs to be replaced. Focus areas for this funding will be to make necessary purchases to fill the <br /> identified gaps and will include active shooter training. The desired outcome is that law enforcement partners have the <br /> needed resources to support this core capability. <br /> Subproject#9 Access Control and Identity Verification <br /> The goal for this subproject is to improve Access Control & Identity Verification. The link to the approved project in the <br /> 16SHSP Investment Justification is— 10)Access Control & Identity Verification -additional EOC/ECC security and <br /> access control upgrades. Across Region 1 there's a gap for a common credentialing/badging system that is cost- <br /> effective, and efficient to use. The primary focus area will be to improve access control and identity verification through <br /> a badging system. Funding will be used to purchase a badging system that is inexpensive and meets the FIPS-201 <br /> badging standard. The desired outcome is that the region will have increased capability in Access Control & Identity <br /> Verification. <br /> -24- <br />