Laserfiche WebLink
• VV <br /> Exhibit A <br /> Scope of Work <br /> Water Main Replacement T Geotechnical Work-Amendment No 1 <br /> Additional Work <br /> Krazan&Associates will provide the additional services under Amendment No 1 as follows: <br /> 1. Traffic Control <br /> Provide an additional flagger,for a total of three,to safely handle traffic control during the soil <br /> boring and logging process. <br /> 2. Coring <br /> Provide for additional coring of existing concrete pavement as a result of thicker and larger <br /> aggregate than previously encountered. <br /> 3. Boring Depth <br /> Provide for additional 10-12 feet of boring depth at the south end of Colby Avenue to provide <br /> information for future sanitary sewer project. <br /> 1 <br />